ExpenditureEffective DateRevenueExpenseTransaction DescriptionDocument Description
MODESTO STREETS1/25/2022$846,619.72DECEMBER 2021 MEASURE L PAYMENT FY2021/22DECEMBER 2021 MEASURE L PAYMENT FY2021/22
MODESTO STREETS1/31/2022$7,107.96MODESTO JANUARY 2022 EXPENDITURESProject 101168 - Scenic Dr. Pave Rehab Phase 1. Employee Hours = 59.9 (January 2022)
MODESTO STREETS1/31/2022$120.06MODESTO JANUARY 2022 EXPENDITURESProject 101168 - Scenic Dr. Pave Rehab Phase 1. Survey Equip Replacement Journal - Aug 2021
MODESTO STREETS1/31/2022$53.36MODESTO JANUARY 2022 EXPENDITURESProject 101168 - Scenic Dr. Pave Rehab Phase 1. Survey Equip Replacement Journal - Dec 2021
MODESTO STREETS1/31/2022$53.36MODESTO JANUARY 2022 EXPENDITURESProject 101168 - Scenic Dr. Pave Rehab Phase 1. Survey Equip Replacement Journal - Oct 2021
MODESTO STREETS1/31/2022$1,053.86MODESTO JANUARY 2022 EXPENDITURESProject 101168 - Scenic Dr. Pave Rehab Phase 1. Survey Equip Replacement Journal - Sept 2021
MODESTO STREETS1/31/2022$19,746.45MODESTO JANUARY 2022 EXPENDITURESProject 101169 - Scenic Dr. Pave Rehab Phase 2. Employee Hours = 155 (January 2022)
MODESTO STREETS1/31/2022$466.90MODESTO JANUARY 2022 EXPENDITURESProject 101169 - Scenic Dr. Pave Rehab Phase 2. Survey Equip Replacement Journal - Aug 2021
MODESTO STREETS1/31/2022$120.06MODESTO JANUARY 2022 EXPENDITURESProject 101169 - Scenic Dr. Pave Rehab Phase 2. Survey Equip Replacement Journal - Oct 2021
MODESTO STREETS1/31/2022$733.70MODESTO JANUARY 2022 EXPENDITURESProject 101169 - Scenic Dr. Pave Rehab Phase 2. Survey Equip Replacement Journal - Sept 2021
MODESTO STREETS1/31/2022$59.20MODESTO JANUARY 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pav Rehab. Employee Hours = 1.5 (January 2022)
MODESTO STREETS1/31/2022$3,611.75MODESTO JANUARY 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pav Rehab. Mark Thomas & Company Inc Invoice #42165
MODESTO STREETS1/31/2022$2,029.94MODESTO JANUARY 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 10 (January 2022)
MODESTO STREETS1/31/2022$2,232.94MODESTO JANUARY 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pvmt Rehab Ph 1. Employee Hours = 11 (January 2022)
MODESTO STREETS1/31/2022$8,265.18MODESTO JANUARY 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maint. Employee Hours = 60 (January 2022)
MODESTO STREETS1/31/2022$1,014.97MODESTO JANUARY 2022 EXPENDITURESProject 101314 - Coffee Rd. Pavement Rehab Phase 2. Employee Hours = 5 (January 2022)
MODESTO STREETS1/31/2022$1,014.97MODESTO JANUARY 2022 EXPENDITURESProject 101315 - Dale Rd. Pavement Rehab. Employee Hours = 5 (January 2022)
MODESTO STREETS2/22/2022$91.89INTEREST MEASURE L PAYMENT FY21/22 QTR 2INTEREST MEASURE L PAYMENT FY21/22 QTR 2
MODESTO STREETS2/22/2022$864,176.48JANUARY 2022 MEASURE L PAYMENT# 6 FY2021/22JANUARY 2022 MEASURE L PAYMENT# 6 FY2021/22
MODESTO STREETS2/28/2022$6,707.78MODESTO FEBRUARY 2022 EXPENDITURESProject 101168 - Scenic Dr. Pavement Rehab Phase 1. Employee Hours = 53.2 (February 2022)
MODESTO STREETS2/28/2022$10,500.00MODESTO FEBRUARY 2022 EXPENDITURESProject 101168 - Scenic Dr. Pavement Rehab Phase 1. George Reed Invoice #JAN33-PP6-13 for Progress Payment #6
MODESTO STREETS2/28/2022$14,918.48MODESTO FEBRUARY 2022 EXPENDITURESProject 101169 - Scenic Dr. Pavement Rehab Phase 2. Employee Hours = 117 (February 2022)
MODESTO STREETS2/28/2022$7.79MODESTO FEBRUARY 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Employee Hours = 0.2 (February 2022)
MODESTO STREETS2/28/2022$13,744.57MODESTO FEBRUARY 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 79 (February 2022)
MODESTO STREETS2/28/2022$7,043.64MODESTO FEBRUARY 2022 EXPENDITURESProject 101248 - Orangeburg Av. Pavement Rehab Phase 1. Employee Hours = 39 (February 2022)
MODESTO STREETS2/28/2022$8,789.15MODESTO FEBRUARY 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maint. Employee Hours = 56 (February 2022)
MODESTO STREETS2/28/2022$1,217.97MODESTO FEBRUARY 2022 EXPENDITURESProject 101314 - Coffee Rd. Pavement Rehab Phase II. Employee Hours = 6 (February 2022)
MODESTO STREETS2/28/2022$811.97MODESTO FEBRUARY 2022 EXPENDITURESProject 101315 - Dale Rd. Pavement Rehab. Employee Hours = 4 (February 2022)
MODESTO STREETS3/22/2022$1,095,906.47FEBRUARY 2022 MEASURE L PAYMENT FY2021/22FEBRUARY 2022 MEASURE L PAYMENT FY2021/22
MODESTO STREETS3/31/2022$1,306.06MODESTO MARCH 2022 EXPENDITURESProject 101168 - Scenic Dr. Pavement Rehab Phase 1. Employee Hours = 10.5 (March 2022)
MODESTO STREETS3/31/2022$101,548.00MODESTO MARCH 2022 EXPENDITURESProject 101168 - Scenic Dr. Pavement Rehab Phase 1. George Reed #FEB22-PP7-2021-13 for Progress Payment #7 and CO#4 and #5
MODESTO STREETS3/31/2022$13,264.61MODESTO MARCH 2022 EXPENDITURESProject 101169 - Scenic Dr. Pavement Rehab Phase 2. Employee Hours = 110.5 (March 2022)
MODESTO STREETS3/31/2022$573.62MODESTO MARCH 2022 EXPENDITURESProject 101169 - Scenic Dr. Pavement Rehab Phase 2. Suvey Equipment Replacement Journal Jan-22
MODESTO STREETS3/31/2022$58.26MODESTO MARCH 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Employee Hours = 1.5 (March 2022)
MODESTO STREETS3/31/2022$22,348.00MODESTO MARCH 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Mark Thomas & Company #42591R
MODESTO STREETS3/31/2022$4,804.90MODESTO MARCH 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 26 (March 2022)
MODESTO STREETS3/31/2022$7,528.19MODESTO MARCH 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1. Employee Hours = 43 (March 2022)
MODESTO STREETS3/31/2022$19,216.14MODESTO MARCH 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Employee Hours = 162.1 (March 2022)
MODESTO STREETS3/31/2022$405.98MODESTO MARCH 2022 EXPENDITURESProject 101314 - Coffee Rd. Pavement Rehab Phase 2. Employee Hours = 2 (March 2022)
MODESTO STREETS3/31/2022$405.98MODESTO MARCH 2022 EXPENDITURESProject 101315 - Dale Rd. Pavement Rehab. Employee Hours = 2 (March 2022)
MODESTO STREETS4/20/2022$818,365.75MARCH 2022 MEASURE L PAYMENT FY2021/22MARCH 2022 MEASURE L PAYMENT FY2021/22
MODESTO STREETS4/30/2022$193.68MODESTO APRIL 2022 EXPENDITURESProject 101168 - Scenic Drive Pavement Rehab Phase 1. Employee Hours = 1.5 (April 2022)
MODESTO STREETS4/30/2022$18,487.99MODESTO APRIL 2022 EXPENDITURESProject 101169 - Scenic Drive Pavement Rehab Phase 2. Employee Hours = 156 (April 2022)
MODESTO STREETS4/30/2022$18.79MODESTO APRIL 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Employee Hours = 0.5 (April 2022)
MODESTO STREETS4/30/2022$57.00MODESTO APRIL 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Clerk Recorder Invoice #ENVIMP-100942040722 for EIR
MODESTO STREETS4/30/2022$20,183.73MODESTO APRIL 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 161.5 (April 2022)
MODESTO STREETS4/30/2022$26,728.20MODESTO APRIL 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1. Employee Hours = 157.8 (April 2022)
MODESTO STREETS4/30/2022$3,762.81MODESTO APRIL 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Employee Hours = 35.5 (April 2022)
MODESTO STREETS4/30/2022$135.70MODESTO APRIL 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Modesto Bee Invoice #108760 for bid advertisement
MODESTO STREETS5/20/2022$812,094.35APRIL 2022 MEASURE L PAYMENT FY2021/22APRIL 2022 MEASURE L PAYMENT FY2021/22
MODESTO STREETS5/20/2022$203.96INTEREST MEASURE L PAYMENT FY21/22 QTR 3APRIL 2022 MEASURE L PAYMENT FY2021/22
MODESTO STREETS5/31/2022$2,533.08MODESTO MAY 2022 EXPENDITURESProject 101168 - Scenic Dr. Pave Rehab Phase 1 - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$520.15MODESTO MAY 2022 EXPENDITURESProject 101168 - Scenic Dr. Pave Rehab Phase 1. Employee Hours = 4 (May 2022)
MODESTO STREETS5/31/2022$5,619.19MODESTO MAY 2022 EXPENDITURESProject 101169 - Scenic Dr. Pave Rehab Phase 2 - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$4,266.46MODESTO MAY 2022 EXPENDITURESProject 101169 - Scenic Dr. Pave Rehab Phase 2. Employee Hours = 36 (May 2022)
MODESTO STREETS5/31/2022$11.36MODESTO MAY 2022 EXPENDITURESProject 101170 - Tully Rd. Pavement Rehab - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$16.69MODESTO MAY 2022 EXPENDITURESProject 101171 - Coffee Rd Pave Rehab Phase 1 - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$22.25MODESTO MAY 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pav Rehab - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$37.58MODESTO MAY 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pav Rehab. Employee Hours = 1 (May 2022)
MODESTO STREETS5/31/2022$35.70MODESTO MAY 2022 EXPENDITURESProject 101245 - 2020 Pavement Condition Survey - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$7,212.31MODESTO MAY 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$8,382.15MODESTO MAY 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 78.5 (May 2022)
MODESTO STREETS5/31/2022$6,467.75MODESTO MAY 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1 - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$1,239.00MODESTO MAY 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1. Employee Hours = 6.5 (May 2022)
MODESTO STREETS5/31/2022$5,605.96MODESTO MAY 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$390.45MODESTO MAY 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Employee Hours = 5.5 (May 2022)
MODESTO STREETS5/31/2022$611.83MODESTO MAY 2022 EXPENDITURESProject 101314 - Coffee Rd. Pavement Rehab Phase 2 - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$464.23MODESTO MAY 2022 EXPENDITURESProject 101315 Dale Rd. Pavement Rehab - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO STREETS5/31/2022$8,201.00MODESTO MAY 2022 EXPENDITURESProject 101315 Dale Rd. Pavement Rehab. Employee Hours = 66 (May 2022)
MODESTO STREETS6/9/2022$999,152.36MAY 2022 MEASURE L PAYMENT FY2021/22MAY 2022 MEASURE L PAYMENT FY2021/22
MODESTO STREETS6/30/2022$1,071,189.48FY21-22 MEASURE L MODESTO REVENUE ACCRUAL JULY 2022MEASURE L JULY 2022 REVENUE ACCRUAL
MODESTO STREETS6/30/2022$884,243.65MEASURE L MODESTO JUNE 2022 REVENUE ACCRUALMEASURE L JUNE 2022 REVENUE ACCRUAL
MODESTO STREETS6/30/2022$1,345.24MEASURE L MODESTO JUNE 2022 REVENUE ACCRUAL INTEREST LOCAL SMEASURE L JUNE 2022 REVENUE ACCRUAL
MODESTO STREETS6/30/2022$29.50MODESTO JUNE 2022 BATCH 2 EXPENDITURESProject 101246 Briggsmore-McHenry to Oakdale - Meyers Nave Invoice 195507
MODESTO STREETS6/30/2022$29.50MODESTO JUNE 2022 BATCH 2 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1 - Meyers Nave Invoice 195507
MODESTO STREETS6/30/2022$119.75MODESTO JUNE 2022 BATCH 3 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Mark Thomas & Company Invoice #41694-B
MODESTO STREETS6/30/2022$179,818.54MODESTO JUNE 2022 BATCH 4 EXPENDITURESProject 101245 - 2020 Pavement Condition Survey. Stanislaus Council of Gov't Invoice #08APR22 for pavement management program
MODESTO STREETS6/30/2022$9,960.00MODESTO JUNE 2022 EXPENDITURESProject 101168 - Scenic Dr. Pavement Rehab Phase 1. Applied Research Associates Inc. Invoice #4776-01
MODESTO STREETS6/30/2022$204.12MODESTO JUNE 2022 EXPENDITURESProject 101168 - Scenic Dr. Pavement Rehab Phase 1. Correction Journal for Material/Striping/Equipment
MODESTO STREETS6/30/2022$1,192.86MODESTO JUNE 2022 EXPENDITURESProject 101168 - Scenic Dr. Pavement Rehab Phase 1. Employee Hours = 9 (June 2022)
MODESTO STREETS6/30/2022$75.16MODESTO JUNE 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Employee Hours = 2 (June 2022)
MODESTO STREETS6/30/2022$3,672.25MODESTO JUNE 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Mark Thomas & Company Invoice #43314
MODESTO STREETS6/30/2022$2,341.18MODESTO JUNE 2022 EXPENDITURESProject 101245 - 2020 Pavement Condition Survey. Employee Hours = 11 (June 2022)
MODESTO STREETS6/30/2022$360.18MODESTO JUNE 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. April 2022 Survey Equipment Journal
MODESTO STREETS6/30/2022$293.25MODESTO JUNE 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. ARC Document Solution Invoice #2580612
MODESTO STREETS6/30/2022$734.06MODESTO JUNE 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 18.9 (June 2022)
MODESTO STREETS6/30/2022$281.42MODESTO JUNE 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Modesto Bee Invoice #123324
MODESTO STREETS6/30/2022$3,653.47MODESTO JUNE 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1. Employee Hours = 19.9 (June 2022)
MODESTO STREETS6/30/2022$5,543.49MODESTO JUNE 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Rehab. Employee Hours = 33.3 (June 2022)
MODESTO STREETS6/30/2022$425.67MODESTO JUNE 2022 EXPENDITURESProject 101314 - Coffee Rd. Pavement Rehab Phase II. Employee Hours = 2 (June 2022)
MODESTO STREETS6/30/2022$8,573.78MODESTO JUNE 2022 EXPENDITURESProject 101315 - Dale Rd. Pavement Rehab. Employee Hours = 69 (June 2022)
MODESTO STREETS6/30/2022$2,778.69MODESTO FY 21-22 CORRECTIONSProject 101123 - Fiber Drop Traffic Signal Cab. Nextperts Inc. Invoice #8039035219F - posted to Streets category instead of Traffic in error (November 2021)
MODESTO STREETS6/30/2022$160.66MODESTO FY 21-22 CORRECTIONSProject 101315 - Dale Road Pavement Rehab. Employee Hours = 0.7 (July 202) Original July 2021 Reporting in error credited the expense instead of cash account.
MODESTO STREETS6/30/2022$63,572.00MODESTO FY 21-22 EXPENDITURES - GRANT MATCHESFY 21-22 Grant Match for Project 100806 - 2016 Pavement Rehab. Total expenses in draw 143,614. Grant paying $77,708
MODESTO STREETS6/30/2022$409,129.00MODESTO FY 21-22 EXPENDITURES - GRANT MATCHES BATCH 3Project 100806 - 2016 Pavement Rehab. Returning match funds previously reported in FY 20-21. Remaining Streets LTF funds now covering expenses
MODESTO STREETS6/30/2022$187,385.45MODESTO FY 21-22 EXPENDITURES - GRANT MATCHES BATCH 3Project 100966 - Pelandale Ave. Pavement Rehabilitation. FY 21-22 Grant Match. Total Expenses in Project are $2,633,119. Tota Measure Lfunds used for project are $482,249
MODESTO STREETS6/30/2022$116,026.70FY 21-22 MODESTO YEAR-END MOE ADJUSTMENTAugust 2021 Project 101168 Scenic Dr. Pavement Rehab Phase 1 Expenditures now being covered by FY21-22 Measure L/SB1 MOE
MODESTO STREETS6/30/2022$26,689.12FY 21-22 MODESTO YEAR-END MOE ADJUSTMENTJuly 2021 Project 101168 Scenic Dr. Pavement Rehab Phase 1 Expenditures now being covered by FY21-22 Measure L/SB1 MOE
MODESTO STREETS6/30/2022$19,903.76FY 21-22 MODESTO YEAR-END MOE ADJUSTMENTOctober 2021 Project 101168 Scenic Dr. Pavement Rehab Phase 1 Expenditures now being covered by FY21-22 Measure L/SB1 MOE
MODESTO STREETS6/30/2022$62,942.96FY 21-22 MODESTO YEAR-END MOE ADJUSTMENTOctober 2021 Project 101168 Scenic Dr. Pavement Rehab Phase 1 George Reed Invoice #SEP21-PP3-2021-13 portion now being covered by FY21-22 Measure L/SB1 MOE
MODESTO STREETS6/30/2022$168,217.46FY 21-22 MODESTO YEAR-END MOE ADJUSTMENTSeptember 2021 Project 101168 Scenic Dr. Pavement Rehab Phase 1 Expenditures now being covered by FY21-22 Measure L/SB1 MOE
MODESTO STREETS7/31/2022$2,163.53MODESTO JULY 2022 EXPENDITURESProject 101168 - Scenic Dr. Pavement Rehab Phase 1. Employee Hours = 13 (July 2022)
MODESTO STREETS7/31/2022$495.90MODESTO JULY 2022 EXPENDITURESProject 101169 - Scenic Dr. Pavement Rehab Phase 2. Employee Hours = 2.5 (July 2022)
MODESTO STREETS7/31/2022$119.75MODESTO JULY 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Mark Thomas & Company Invoice #41694-B
MODESTO STREETS7/31/2022$4,009.72MODESTO JULY 2022 EXPENDITURESProject 101245 - 2020 Pavement Condition Survey. Employee Hours = 18 (July 2022)
MODESTO STREETS7/31/2022$1,769.70MODESTO JULY 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 42 (July 2022)
MODESTO STREETS7/31/2022$9,645.95MODESTO JULY 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Employee Hours = 57.9 (July 2022)
MODESTO STREETS7/31/2022$119.75MODSTO JULY 2022 BATCH 2 EXPENDITURESReverse Project 101214 - Granger Neighborhood Pavement Rehab. Mark Thomas & Company Invoice #41694-B
MODESTO STREETS8/31/2022$9,800.09MODESTO AUGUST 2022 EXPENDITURESProject 101169 - Scenic Dr. Pavement Rehab Phase 2. Employee Hours = 74 (August 2022)
MODESTO STREETS8/31/2022$44.87MODESTO AUGUST 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Employee Hours = 1.2 (August 2022)
MODESTO STREETS8/31/2022$1,347.02MODESTO AUGUST 2022 EXPENDITURESProject 101245 - 2020 Pavement Condition Survey. Employee Hours = 6.8 (August 2022)
MODESTO STREETS8/31/2022$2,079.21MODESTO AUGUST 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 31 (August 2022)
MODESTO STREETS8/31/2022$904.60MODESTO AUGUST 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehabe Phase 1. Employee Hours = 6 (August 2022)
MODESTO STREETS8/31/2022$354,342.20MODESTO AUGUST 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. American Pavement Systems Invoice #JUL22-PP1-2022-19 for progress payment #1
MODESTO STREETS8/31/2022$33,322.39MODESTO AUGUST 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Employee Hours = 191.9 (August 2022)
MODESTO STREETS8/31/2022$600.00MODESTO AUGUST 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance.DF Engineering Invoice #23966
MODESTO STREETS9/20/2022$763,545.34MEASURE L PAYMENT FY22-23 AUGUST 2022MEASURE L PAYMENT FY22-23 AUGUST 2022
MODESTO STREETS9/30/2022$30,636.00MODESTO SEPTEMBER 2022 EXPENDITURESProject 101169 - Scenic Drive Pavement Rehab Phase 2. Employee Hours = 213.5 (September 2022)
MODESTO STREETS9/30/2022$4,686.12MODESTO SEPTEMBER 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 28.8 (September 2022)
MODESTO STREETS9/30/2022$3,402.29MODESTO SEPTEMBER 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1. Employee Hours = 17.8 (September 2022)
MODESTO STREETS9/30/2022$443,617.94MODESTO SEPTEMBER 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. American Pavement Systems Inc. Invoice #AUG22-PP2-2022-19
MODESTO STREETS9/30/2022$150.00MODESTO SEPTEMBER 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. DF Engineering Invoice #23979
MODESTO STREETS9/30/2022$27,633.53MODESTO SEPTEMBER 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Employee Hours = 165.4 (September 2022)
MODESTO STREETS9/30/2022$186.76MODESTO SEPTEMBER 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Survey Equipment Journal Jul-Aug 2023
MODESTO STREETS9/30/2022$1,113.78MODESTO SEPTEMBER 2022 EXPENDITURESProject 101392 - Orangeburg Ave. Pavement Rehab Phase 2. Employee Hours = 5 (September 2022)
MODESTO STREETS10/18/2022$884,579.99MEASURE L PAYMENT FY22-23 SEPTEMBER 2022 MODESTOMEASURE L PAYMENT FY22-23 SEPTEMBER 2022
MODESTO STREETS10/18/2022$3,549.11MEASURE L PAYMENT FY22-23 SEPTEMBER 2022 MODESTO INTERESTMEASURE L PAYMENT FY22-23 SEPTEMBER 2022
MODESTO STREETS10/31/2022$17,294.50MODESTO OCTOBER 2022 EXPENDITURESProject 101169 - Scenic Dr. Pavement Rehab Phase 2. Employee Hours = 133 (October 2022)
MODESTO STREETS10/31/2022$19.61MODESTO OCTOBER 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Employee Hours = 0.5 (October 2022)
MODESTO STREETS10/31/2022$891.03MODESTO OCTOBER 2022 EXPENDITURESProject 101245 - 2020 Pavement Condition Survey. Employee Hours = 4 (October 2022)
MODESTO STREETS10/31/2022$7,734.58MODESTO OCTOBER 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 51.7 (October 2022)
MODESTO STREETS10/31/2022$4,118.33MODESTO OCTOBER 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1. Employee Hours = 24 (October 2022)
MODESTO STREETS10/31/2022$76,582.65MODESTO OCTOBER 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. American Pavement System Inc. Invoice #OCT22-PP4-2022-19
MODESTO STREETS10/31/2022$105,933.74MODESTO OCTOBER 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. American Pavement System Inc. Invoice #SEP22-PP3-2022-19
MODESTO STREETS10/31/2022$16,193.84MODESTO OCTOBER 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Employee Hours = 103.2 (October 2022)
MODESTO STREETS11/29/2022$947,033.48MEASURE L PAYMENT FY22-23 OCTOBER 2022MEASURE L PAYMENT FY22-23 OCTOBER 2022
MODESTO STREETS11/30/2022$17,538.20MODESTO NOVEMBER 2022 EXPENDITURESProject 101169 - Scenic Dr. Pavement Rehab Phase 2. Employee Hours = 130 (November 2022)
MODESTO STREETS11/30/2022$647.26MODESTO NOVEMBER 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Employee Hours = 4.5 (November 2022)
MODESTO STREETS11/30/2022$3,703.50MODESTO NOVEMBER 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Mark Thomas & Company Invoice #42845
MODESTO STREETS11/30/2022$4,502.94MODESTO NOVEMBER 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 26.5 (November 2022)
MODESTO STREETS11/30/2022$348.75MODESTO NOVEMBER 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. O'Dell Engineering Invoice #3905907 for SWPPP Review
MODESTO STREETS11/30/2022$3,465.92MODESTO NOVEMBER 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1. Employee Hours = 19 (November 2022)
MODESTO STREETS11/30/2022$118.00MODESTO NOVEMBER 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1. Meyers Nave Invoice #196509
MODESTO STREETS11/30/2022$348.75MODESTO NOVEMBER 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1. O'Dell Engineering Invoice #3905907 for SWPPP Review
MODESTO STREETS11/30/2022$190,154.37MODESTO NOVEMBER 2022 EXPENDITURESProject 101249 - Pelandale Neighbhorhood Pavement Maintenance. American Pavement Systems Invoice #NOV22-PP5-2022-19
MODESTO STREETS11/30/2022$8,379.05MODESTO NOVEMBER 2022 EXPENDITURESProject 101249 - Pelandale Neighbhorhood Pavement Maintenance. Employee Hours = 54.6 (November 2022)
MODESTO STREETS12/13/2022$967,763.47MEASURE L PAYMENT FY22-23 NOVEMBER 2022MEASURE L PAYMENT FY22-23 NOVEMBER 2022
MODESTO STREETS12/31/2022$13,933.85MODESTO DECEMBER 2022 EXPENDITURESProject 101169 - Scenic Dr. Pavement Rehab Phase 2. Employee Hours = 103.5 (December 2022)
MODESTO STREETS12/31/2022$66.70MODESTO DECEMBER 2022 EXPENDITURESProject 101169 - Scenic Dr. Pavement Rehab Phase 2. Survey Equipment Journal Sep-Oct.
MODESTO STREETS12/31/2022$74.75MODESTO DECEMBER 2022 EXPENDITURESProject 101214 - Granger Neighborhood Pavement Rehab. Employee Hours = 2 (December 2022)
MODESTO STREETS12/31/2022$13,042.48MODESTO DECEMBER 2022 EXPENDITURESProject 101246 - Briggsmore-McHenry to Oakdale. Employee Hours = 75.8 (December 2022)
MODESTO STREETS12/31/2022$3,043.89MODESTO DECEMBER 2022 EXPENDITURESProject 101248 - Orangeburg Ave. Pavement Rehab Phase 1. Employee Hours = 17 (December 2022)
MODESTO STREETS12/31/2022$137,201.12MODESTO DECEMBER 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. American Pavement Systems Inc. Invoice #NOV22=PP5-2022-19 credit
MODESTO STREETS12/31/2022$15,979.78MODESTO DECEMBER 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Employee Hours = 108 (December 2022)
MODESTO STREETS12/31/2022$280.14MODESTO DECEMBER 2022 EXPENDITURESProject 101249 - Pelandale Neighborhood Pavement Maintenance. Survey Equipment Journal Sep-Oct.
MODESTO TRAFFIC1/25/2022$169,323.94DECEMBER 2021 MEASURE L PAYMENT FY2021/22DECEMBER 2021 MEASURE L PAYMENT FY2021/22
MODESTO TRAFFIC1/31/2022$322.88MODESTO JANUARY 2022 EXPENDITURESProject 101040 - Orville Wright Elementary Improvements. Employee Hours = 4 (January 2022)
MODESTO TRAFFIC1/31/2022$43.40MODESTO JANUARY 2022 EXPENDITURESProject 101172 - School Safety Program Study. Employee Hours = 1.1 (January 2022)
MODESTO TRAFFIC1/31/2022$76,537.31MODESTO JANUARY 2022 EXPENDITURESProject 101174 - Adv. School Zone Beacons. Jam Services Invoice #153504 for Solar Advanced Beacons
MODESTO TRAFFIC1/31/2022$160.26MODESTO JANUARY 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 4 (January 2022)
MODESTO TRAFFIC1/31/2022$7.19MODESTO JANUARY 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. FedEx Invoice #PC1444413 for shipping charges
MODESTO TRAFFIC2/22/2022$18.37INTEREST MEASURE L PAYMENT FY21/22 QTR 2INTEREST MEASURE L PAYMENT FY21/22 QTR 2
MODESTO TRAFFIC2/22/2022$172,835.30JANUARY 2022 MEASURE L PAYMENT# 6 FY2021/22JANUARY 2022 MEASURE L PAYMENT# 6 FY2021/22
MODESTO TRAFFIC2/28/2022$464.12MODESTO FEBRUARY 2022 EXPENDITURESProject 101039 - Task Force for School Safety. Employee Hours = 3 (February 2022)
MODESTO TRAFFIC2/28/2022$19.73MODESTO FEBRUARY 2022 EXPENDITURESProject 101172 - School Safety Program Study. Employee Hours = 0.5 (February 2022)
MODESTO TRAFFIC2/28/2022$48,473.63MODESTO FEBRUARY 2022 EXPENDITURESProject 101174 - Adv. School Zone Beacons. Jam Services Invoice #15476 for Solar Advanced school zone beacons
MODESTO TRAFFIC2/28/2022$711.18MODESTO FEBRUARY 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 7 (February 2022)
MODESTO TRAFFIC2/28/2022$7.19MODESTO FEBRUARY 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. FedEx Invoice #PC1455425 for shipping and delivery charges for project
MODESTO TRAFFIC2/28/2022$23.63MODESTO FEBRUARY 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours = 0.2 (February 2022)
MODESTO TRAFFIC2/28/2022$66,019.50MODESTO FEBRUARY 2022 EXPENDITURESProject 101242 - Install Video Detection. Iteris Invoice #139193 for Next DVP Module Assembly
MODESTO TRAFFIC2/28/2022$24,757.31MODESTO FEBRUARY 2022 EXPENDITURESProject 101242 - Install Video Detection. Iteris Invoice #140089 for Next-CCU Pak, Pack Out Kit, CCU, Vantage Next
MODESTO TRAFFIC2/28/2022$118,047.61MODESTO FEBRUARY 2022 EXPENDITURESProject 101242 - Install Video Detection. Iteris Invoice #140432 for Vector-Next Sensor Assembly
MODESTO TRAFFIC2/28/2022$45,695.85MODESTO FEBRUARY 2022 EXPENDITURESProject 101242 - Install Video Detection. Iteris Invoice #140630 for Vector-Next Sensor Assembly
MODESTO TRAFFIC3/22/2022$219,181.29FEBRUARY 2022 MEASURE L PAYMENT FY2021/22FEBRUARY 2022 MEASURE L PAYMENT FY2021/22
MODESTO TRAFFIC3/31/2022$1,779.13MODESTO MARCH 2022 EXPENDITURESProject 101039 - Task Force for School Safety. Employee Hours = 11.5 (March 2022)
MODESTO TRAFFIC3/31/2022$11,951.79MODESTO MARCH 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 105.6 (March 2022)
MODESTO TRAFFIC3/31/2022$56.37MODESTO MARCH 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours = 1.5 (March 2022)
MODESTO TRAFFIC3/31/2022$20,463.89MODESTO MARCH 2022 EXPENDITURESProject 101242 - Intstall Video Detection. Iteris #142793 for CCU PAK & Vector Next T29 material
MODESTO TRAFFIC3/31/2022$1,350.45MODESTO MARCH 2022 EXPENDITURESProject 101317 - Carpenter/Maze/Prescott Fiber. Employee Hours = 50 (March 2022)
MODESTO TRAFFIC3/31/2022$1,350.45MODESTO MARCH 2022 EXPENDITURESProject 101318 - Fiber Drop Downtown (G&H). Employee Hours = 50 (March 2022)
MODESTO TRAFFIC4/20/2022$163,673.15MARCH 2022 MEASURE L PAYMENT FY2021/22MARCH 2022 MEASURE L PAYMENT FY2021/22
MODESTO TRAFFIC4/30/2022$2,784.70MODESTO APRIL 2022 EXPENDITURESProject 101039 - Task force for School Safety. Employee Hours = 18 (April 2022)
MODESTO TRAFFIC4/30/2022$37.60MODESTO APRIL 2022 EXPENDITURESProject 101040 - Orville Wright Elementary Improvements. Employee Hours = 0.3 (April 2022)
MODESTO TRAFFIC4/30/2022$62,640.93MODESTO APRIL 2022 EXPENDITURESProject 101123 - Fiber Drop Traffic Signal Cabinet. Netxperts Inc. Invoice #8040573783F for IE5000 with 12GE Copper, DNA Advantage, 5 year, Higher PoE.
MODESTO TRAFFIC4/30/2022$18.79MODESTO APRIL 2022 EXPENDITURESProject 101172 - School Safety Program Study. Employee Hours = 0.5 (April 2022)
MODESTO TRAFFIC4/30/2022$4,488.68MODESTO APRIL 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 51.7 (April 2022)
MODESTO TRAFFIC4/30/2022$75.17MODESTO APRIL 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours = 2 (April 2022)
MODESTO TRAFFIC4/30/2022$999.33MODESTO APRIL 2022 EXPENDITURESProject 101317 - Carpenter/Maze/Prescott Fiber. Employee Hours = 37 (April 2022)
MODESTO TRAFFIC4/30/2022$999.33MODESTO APRIL 2022 EXPENDITURESProject 101318 - Fiber Drop Downtown (G & H). Employee Hours = 37 (April 2022)
MODESTO TRAFFIC5/20/2022$162,418.87APRIL 2022 MEASURE L PAYMENT FY2021/22APRIL 2022 MEASURE L PAYMENT FY2021/22
MODESTO TRAFFIC5/20/2022$40.79INTEREST MEASURE L PAYMENT FY21/22 QTR 3APRIL 2022 MEASURE L PAYMENT FY2021/22
MODESTO TRAFFIC5/31/2022$457.46MODESTO MAY 2022 EXPENDITURESProject 101039 - Task Force for School Safety - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO TRAFFIC5/31/2022$48.57MODESTO MAY 2022 EXPENDITURESProject 101040 - Orville Wright Elementary Improvements - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO TRAFFIC5/31/2022$37.20MODESTO MAY 2022 EXPENDITURESProject 101172 - School Safety Program Study - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO TRAFFIC5/31/2022$10,950.75MODESTO MAY 2022 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-070-18
MODESTO TRAFFIC5/31/2022$4,843.00MODESTO MAY 2022 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-070-19
MODESTO TRAFFIC5/31/2022$1,889.75MODESTO MAY 2022 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-070-20
MODESTO TRAFFIC5/31/2022$18.79MODESTO MAY 2022 EXPENDITURESProject 101172 - School Safety Program Study. Employee Hours = 0.5 (May 2022)
MODESTO TRAFFIC5/31/2022$268.87MODESTO MAY 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO TRAFFIC5/31/2022$2,344.67MODESTO MAY 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 36.4 (May 2022)
MODESTO TRAFFIC5/31/2022$1,795.45MODESTO MAY 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO TRAFFIC5/31/2022$37.58MODESTO MAY 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours = 1 (May 2022)
MODESTO TRAFFIC5/31/2022$594.20MODESTO MAY 2022 EXPENDITURESProject 101317 - Carpenter/Maze/Prescott Fiber. Employee Hours = 22 (May 2022)
MODESTO TRAFFIC5/31/2022$648.22MODESTO MAY 2022 EXPENDITURESProject 101318 - Fiber Drop Downtown (G & H). Employee Hours = 24 (May 2022)
MODESTO TRAFFIC6/9/2022$199,830.47MAY 2022 MEASURE L PAYMENT FY2021/22MAY 2022 MEASURE L PAYMENT FY2021/22
MODESTO TRAFFIC6/30/2022$214,237.90FY21-22 MEASURE L MODESTO REVENUE ACCRUAL JULY 2022MEASURE L JULY 2022 REVENUE ACCRUAL
MODESTO TRAFFIC6/30/2022$176,848.73MEASURE L MODESTO JUNE 2022 REVENUE ACCRUALMEASURE L JUNE 2022 REVENUE ACCRUAL
MODESTO TRAFFIC6/30/2022$269.04MEASURE L MODESTO JUNE 2022 REVENUE ACCRUAL INTEREST TRAFFICMEASURE L JUNE 2022 REVENUE ACCRUAL
MODESTO TRAFFIC6/30/2022$4,571.25MODESTO JUNE 2022 BATCH 3 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-70-22
MODESTO TRAFFIC6/30/2022$3,520.50MODESTO JUNE 2022 BATCH 3 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-70-23
MODESTO TRAFFIC6/30/2022$4,442.50MODESTO JUNE 2022 BATCH 3 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-70-24
MODESTO TRAFFIC6/30/2022$10,731.75MODESTO JUNE 2022 BATCH 3 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-70-25
MODESTO TRAFFIC6/30/2022$7.19MODESTO JUNE 2022 BATCH 3 EXPENDITURESProject 101175 - School Crosswalk Beacon. FedEx Invoice PC1496531
MODESTO TRAFFIC6/30/2022$930.00MODESTO JUNE 2022 BATCH 3 EXPENDITURESProject 101175 - School Crosswalk Beacon. O'Dell Engineering Invoice #3905903 for RRFB review
MODESTO TRAFFIC6/30/2022$24.12MODESTO JUNE 2022 BATCH 3 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Timesheet Correction for PPE 1.3.22
MODESTO TRAFFIC6/30/2022$973.23MODESTO JUNE 2022 EXPENDITURESProject 101039 - Task Force for School Safety. Employee Hours = 6 (June 2022)
MODESTO TRAFFIC6/30/2022$2,122.46MODESTO JUNE 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 40.4 (June 2022)
MODESTO TRAFFIC6/30/2022$240.12MODESTO JUNE 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. March 2022 Survey Equipment Journal
MODESTO TRAFFIC6/30/2022$271.25MODESTO JUNE 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. O'Dell Engineering Invoice #3905904 for SWPPP Review
MODESTO TRAFFIC6/30/2022$18.79MODESTO JUNE 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours = 0.5 (June 2022)
MODESTO TRAFFIC6/30/2022$216.07MODESTO JUNE 2022 EXPENDITURESProject 101317 - Carpenter/Maze/Prescott Fiber. Employee Hours = 8 (June 2022)
MODESTO TRAFFIC6/30/2022$216.07MODESTO JUNE 2022 EXPENDITURESProject 101318 - Fiber Drop Downtown (G & H). Employee Hours = 8 (June 2022)
MODESTO TRAFFIC6/30/2022$2,778.69MODESTO FY 21-22 CORRECTIONSProject 101123 - Fiber Drop Traffic Signal Cab. Nextperts Inc. Invoice #8039035219F - posted to Streets category instead of Traffic in error (November 2021)
MODESTO TRAFFIC6/30/2022$526.00MODESTO FY 21-22 EXPENDITURES - GRANT MATCHESFY 21-22 Grant Match for Project 100990 - System Safety Analysis Program (LRSPL Funds). Total expenses in draw $3,558. Grant paying $3,033
MODESTO TRAFFIC6/30/2022$14,183.00MODESTO FY 21-22 EXPENDITURES - GRANT MATCHESFY 21-22 Grant Match for Project 101322 - Claus Rd. Signal Coordination CMAQ. Total expenses in draw $17,553. Grant paying $3,370
MODESTO TRAFFIC6/30/2022$14,766.00MODESTO FY 21-22 EXPENDITURES - GRANT MATCHESFY 21-22 Grant Match for Project 101323 - Scenic Dr. Signal Coordination. Total expenses in draw $15,768. Grant paying $1,002
MODESTO TRAFFIC6/30/2022$109.00MODESTO FY 21-22 EXPENDITURES - GRANT MATCHESFY 21-22 Grant Match for Project 101383 - Oakdale Rd Improvement. Total expenses in draw $1,091. Grant paying $982
MODESTO TRAFFIC6/30/2022$93.00MODESTO FY 21-22 EXPENDITURES - GRANT MATCHESFY 21-22 Grant Match for Project 101394 - Sylvan/Standiford PHB's. Total expenses in draw $929. Grant paying $836
MODESTO TRAFFIC6/30/2022$29,581.12MODESTO FY 21-22 EXPENDITURES - GRANT MATCHES BATCH 2FY 21-22 Grant Match for Project 100632 - Traffic Signals 2013. Final match for project. Total grant funds $833,842.93 and total Match $169,432.12
MODESTO TRAFFIC7/31/2022$848.86MODESTO JULY 2022 EXPENDITURESProject 101039 - Task Force for School Safety. Employee Hours = 5 (July 2022)
MODESTO TRAFFIC7/31/2022$7.48MODESTO JULY 2022 EXPENDITURESProject 101172 - School Safety Program Study. Employee Hours = 0.2 (July 2022)
MODESTO TRAFFIC7/31/2022$2,712.62MODESTO JULY 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 26.4 (July 2022)
MODESTO TRAFFIC7/31/2022$7.19MODESTO JULY 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. FedEx Invoice PC1496531
MODESTO TRAFFIC7/31/2022$930.00MODESTO JULY 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. O'Dell Engineering Invoice #3905903 for RRFB review
MODESTO TRAFFIC7/31/2022$1,576.09MODESTO JULY 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours = 11.5 (July 2022)
MODESTO TRAFFIC7/31/2022$591.85MODESTO JULY 2022 EXPENDITURESProject 101317 - Carpenter/Maze/Prescott Fiber. Employee Hours = 22 (July 2022)
MODESTO TRAFFIC7/31/2022$564.95MODESTO JULY 2022 EXPENDITURESProject 101318 - Fiber Drop Downtown (G&H). Employee Hours = 21 (July 2022)
MODESTO TRAFFIC7/31/2022$7.19MODSTO JULY 2022 BATCH 2 EXPENDITURESReverse Project 101175 - School Crosswalk Beacon. FedEx Invoice #PC1496531
MODESTO TRAFFIC7/31/2022$930.00MODSTO JULY 2022 BATCH 2 EXPENDITURESReverse Project 101175 - School Crosswalk Beacon. O'Dell Engineering Invoice #3905903 for RRFB Review
MODESTO TRAFFIC8/31/2022$679.09MODESTO AUGUST 2022 EXPENDITURESProject 101039 - Task Force for School Safety. Employee Hours = 4 (August 2022)
MODESTO TRAFFIC8/31/2022$2,321.75MODESTO AUGUST 2022 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-070-21
MODESTO TRAFFIC8/31/2022$399.91MODESTO AUGUST 2022 EXPENDITURESProject 101172 - School Safety Program Study. Employee Hours = 3.3 (August 2022)
MODESTO TRAFFIC8/31/2022$4,341.65MODESTO AUGUST 2022 EXPENDITURESProject 101175 -School Crosswalk Beacon. Employee Hours = 58.9 (August 2022)
MODESTO TRAFFIC8/31/2022$1,694.25MODESTO AUGUST 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours = 10.3 (August 2022)
MODESTO TRAFFIC8/31/2022$1,533.45MODESTO AUGUST 2022 EXPENDITURESProject 101317 - Carpenter/Maze/Prescott Fiber. Employee Hours = 57 (August 2022)
MODESTO TRAFFIC8/31/2022$1,533.45MODESTO AUGUST 2022 EXPENDITURESProject 101318 - Fiber Drop Downtown (G & H). Employee Hours = 57 (August 2022)
MODESTO TRAFFIC9/20/2022$152,709.07MEASURE L PAYMENT FY22-23 AUGUST 2022MEASURE L PAYMENT FY22-23 AUGUST 2022
MODESTO TRAFFIC9/30/2022$679.09MODESTO SEPTEMBER 2022 EXPENDITURESProject 101039 - Task Force for School Safety. Employee Hours = 4 (September 2022)
MODESTO TRAFFIC9/30/2022$104.00MODESTO SEPTEMBER 2022 EXPENDITURESProject 101172 - School Safety Program Study. Employee Hours = 1.5 (September 2022)
MODESTO TRAFFIC9/30/2022$8,443.44MODESTO SEPTEMBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 81.6 (September 2022)
MODESTO TRAFFIC9/30/2022$88,214.75MODESTO SEPTEMBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Ray's Electric Invoice #AUG22-PP1-2022-09
MODESTO TRAFFIC9/30/2022$19.61MODESTO SEPTEMBER 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours = 0.5 (September 2022)
MODESTO TRAFFIC9/30/2022$1,049.19MODESTO SEPTEMBER 2022 EXPENDITURESProject 101317 - Carpenter/Maze/Prescott Fiber. Employee Hours = 39 (September 2022)
MODESTO TRAFFIC9/30/2022$995.39MODESTO SEPTEMBER 2022 EXPENDITURESProject 101318 - Fiber Drop Downtown (G & H). Employee Hours = 37 (September 2022)
MODESTO TRAFFIC10/18/2022$176,916.00MEASURE L PAYMENT FY22-23 SEPTEMBER 2022 MODESTOMEASURE L PAYMENT FY22-23 SEPTEMBER 2022
MODESTO TRAFFIC10/18/2022$709.82MEASURE L PAYMENT FY22-23 SEPTEMBER 2022 MODESTO INTERESTMEASURE L PAYMENT FY22-23 SEPTEMBER 2022
MODESTO TRAFFIC10/31/2022$679.09MODESTO OCTOBER 2022 EXPENDITURESProject 101039 - Task Force for School Safety. Employee Hours = 4 (October 2022)
MODESTO TRAFFIC10/31/2022$254.67MODESTO OCTOBER 2022 EXPENDITURESProject 101089 - Tully Rd. Safety Improvement Project. Employee Hours = 1.5 (October 2022)
MODESTO TRAFFIC10/31/2022$6,900.00MODESTO OCTOBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Azco Supply Inc. Invoice #421944 for Blinkersign
MODESTO TRAFFIC10/31/2022$543.38MODESTO OCTOBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Azco Supply Inc. Invoice #421944 for Blinkersign Sales Tax Portion
MODESTO TRAFFIC10/31/2022$11,394.16MODESTO OCTOBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 118.8 (October 2022)
MODESTO TRAFFIC10/31/2022$159,850.00MODESTO OCTOBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Ray's Electric Invoice #OCT22-PP3-2022-09 for Progress Payment #3
MODESTO TRAFFIC10/31/2022$64,708.00MODESTO OCTOBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Ray's Electric Invoice #SEP22-PP2-2022-09 for Progress Payment #2
MODESTO TRAFFIC10/31/2022$14,636.29MODESTO OCTOBER 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours = 144.5 (October 2022)
MODESTO TRAFFIC10/31/2022$484.24MODESTO OCTOBER 2022 EXPENDITURESProject 101317 - Carpenter/Maze/Prescott Fiber. Employee Hours = 18 (October 2022)
MODESTO TRAFFIC10/31/2022$1,372.02MODESTO OCTOBER 2022 EXPENDITURESProject 101318 - Fiber Drop Downtown (G&H). Employee Hours = 51 (October 2022)
MODESTO TRAFFIC11/29/2022$189,406.70MEASURE L PAYMENT FY22-23 OCTOBER 2022 MODESTOMEASURE L PAYMENT FY22-23 OCTOBER 2022
MODESTO TRAFFIC11/30/2022$2,631.49MODESTO NOVEMBER 2022 EXPENDITURESProject 101039 - Task Force for School Safety. Employee Hours = 15.5 (November 2022)
MODESTO TRAFFIC11/30/2022$13,901.48MODESTO NOVEMBER 2022 EXPENDITURESProject 101123 - Fiber Drop Traffic Signal Cab. Netxperts Inc. Invoice #8042480084F for materials.
MODESTO TRAFFIC11/30/2022$3,353.00MODESTO NOVEMBER 2022 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-070-26
MODESTO TRAFFIC11/30/2022$1,881.50MODESTO NOVEMBER 2022 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-070-27
MODESTO TRAFFIC11/30/2022$1,742.00MODESTO NOVEMBER 2022 EXPENDITURESProject 101172 - School Safety Program Study. Alta Planning + Design Invoice #2020-070-28
MODESTO TRAFFIC11/30/2022$4,971.96MODESTO NOVEMBER 2022 EXPENDITURESProject 101174 - Adv. School Zone Beacons. JAM Services Invoice #163166 for materials.
MODESTO TRAFFIC11/30/2022$9,334.54MODESTO NOVEMBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 101.1 (November 2022)
MODESTO TRAFFIC11/30/2022$14,257.39MODESTO NOVEMBER 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours = 147.2 (November 2022)
MODESTO TRAFFIC11/30/2022$1,125.76MODESTO NOVEMBER 2022 EXPENDITURESProject 101317 - Carpenter/Maze/Prescott Fiber. Employee Hours = 29 (November 2022)
MODESTO TRAFFIC11/30/2022$134.51MODESTO NOVEMBER 2022 EXPENDITURESProject 101318 - Fiber Drop Downtown (G & H). Employee Hours = 5 (November 2022)
MODESTO TRAFFIC11/30/2022$511.15MODESTO NOVEMBER 2022 EXPENDITURESProject 101397 - Fiber Drop Sisk Road. Employee Hours = 19 (November 2022)
MODESTO TRAFFIC12/13/2022$193,552.69MEASURE L PAYMENT FY22-23 NOVEMBER 2022 MODESTOMEASURE L PAYMENT FY22-23 NOVEMBER 2022
MODESTO TRAFFIC12/31/2022$2,207.04MODESTO DECEMBER 2022 EXPENDITURESProject 101039 - Task Force for School Safety. Employee Hours = 13 (December 2022)
MODESTO TRAFFIC12/31/2022$1,260.92MODESTO DECEMBER 2022 EXPENDITURESProject 101040 - Orville Wright Elem. Improvements. Employee Hours = 7.5 (December 2022)
MODESTO TRAFFIC12/31/2022$1,852.26MODESTO DECEMBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Employee Hours = 32.2 (December 2022)
MODESTO TRAFFIC12/31/2022$425.00MODESTO DECEMBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Krazan & Associates Invoice #760884-17543 for material testing
MODESTO TRAFFIC12/31/2022$425.00MODESTO DECEMBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Krazan & Associates Invoice #760965-17543 for material testing
MODESTO TRAFFIC12/31/2022$153,002.75MODESTO DECEMBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Rays Electric Invoice #NOV22-PP4-2022-09
MODESTO TRAFFIC12/31/2022$173.42MODESTO DECEMBER 2022 EXPENDITURESProject 101175 - School Crosswalk Beacon. Survey Equipment Journal Sep-Oct.
MODESTO TRAFFIC12/31/2022$11,639.75MODESTO DECEMBER 2022 EXPENDITURESProject 101178 - Neighborhood Traffic Calming. Employee Hours 120.2 (December 2022)
MODESTO TRAFFIC12/31/2022$36,000.00MODESTO DECEMBER 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. American Pavement Systems Inc. Invoice #NOV22-PP5-2022-19 Edgebrook Traffic Portion
MODESTO TRAFFIC12/31/2022$968.49MODESTO DECEMBER 2022 EXPENDITURESProject 101317 - Carpenter/Maze/Prescott Fiber. Employee Hours = 36 (December 2022)
MODESTO TRAFFIC12/31/2022$1,223.78MODESTO DECEMBER 2022 EXPENDITURESProject 101318 - Fiber Drop Downtown (G&H). Employee Hours = 40 (December 2022)
MODESTO BIKE1/25/2022$84,661.97DECEMBER 2021 MEASURE L PAYMENT FY2021/22DECEMBER 2021 MEASURE L PAYMENT FY2021/22
MODESTO BIKE1/31/2022$1,219.75MODESTO JANUARY 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design Invoice #2018-114-40 for Engineering Services
MODESTO BIKE1/31/2022$2,854.50MODESTO JANUARY 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design Invoice #2018-114-41 for Engineering Services
MODESTO BIKE1/31/2022$39.43MODESTO JANUARY 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 1 (January 2022)
MODESTO BIKE1/31/2022$2,665.82MODESTO JANUARY 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maint. Employee Hours = 16 (January 2022)
MODESTO BIKE2/22/2022$9.19INTEREST MEASURE L PAYMENT FY21/22 QTR 2INTEREST MEASURE L PAYMENT FY21/22 QTR 2
MODESTO BIKE2/22/2022$86,417.65JANUARY 2022 MEASURE L PAYMENT# 6 FY2021/22JANUARY 2022 MEASURE L PAYMENT# 6 FY2021/22
MODESTO BIKE2/28/2022$1,693.66MODESTO FEBRUARY 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 10.7 (February 2022)
MODESTO BIKE2/28/2022$5,445.54MODESTO FEBRUARY 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 30.5 (February 2022)
MODESTO BIKE3/22/2022$109,590.65FEBRUARY 2022 MEASURE L PAYMENT FY2021/22FEBRUARY 2022 MEASURE L PAYMENT FY2021/22
MODESTO BIKE3/31/2022$597.00MODESTO MARCH 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design #2018-114-42 for Engineering Services
MODESTO BIKE3/31/2022$76.10MODESTO MARCH 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 2 (March 2022)
MODESTO BIKE3/31/2022$226.08MODESTO MARCH 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. ARC Document Solutions #2556448
MODESTO BIKE3/31/2022$17,403.22MODESTO MARCH 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 98.5 (March 2022)
MODESTO BIKE4/20/2022$81,836.57MARCH 2022 MEASURE L PAYMENT FY2021/22MARCH 2022 MEASURE L PAYMENT FY2021/22
MODESTO BIKE4/30/2022$37.58MODESTO APRIL 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 1 (April 2022)
MODESTO BIKE4/30/2022$50.12MODESTO APRIL 2022 EXPENDITURESProject 101126 - Dry Creek Trail Maintenance. Employee Hours = 0.4 (April 2022)
MODESTO BIKE4/30/2022$3,450.91MODESTO APRIL 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 17 (April 2022)
MODESTO BIKE4/30/2022$405.99MODESTO APRIL 2022 EXPENDITURESProject 101250 - Neighborhood ADA Program. Employee Hours = 2 (April 2022)
MODESTO BIKE5/20/2022$81,209.44APRIL 2022 MEASURE L PAYMENT FY2021/22APRIL 2022 MEASURE L PAYMENT FY2021/22
MODESTO BIKE5/20/2022$20.39INTEREST MEASURE L PAYMENT FY21/22 QTR 3APRIL 2022 MEASURE L PAYMENT FY2021/22
MODESTO BIKE5/31/2022$270.56MODESTO MAY 2022 EXPENDITURESProject 101041 - Active Transportation Plan - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO BIKE5/31/2022$77.89MODESTO MAY 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 2 (May 2022)
MODESTO BIKE5/31/2022$34.44MODESTO MAY 2022 EXPENDITURESProject 101126 - Dry Creek Trail Maintenance - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO BIKE5/31/2022$59.00MODESTO MAY 2022 EXPENDITURESProject 101126 - Dry Creek Trail Maintenance - Meyers Nave Invoice #188813
MODESTO BIKE5/31/2022$1,466.76MODESTO MAY 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO BIKE5/31/2022$252.31MODESTO MAY 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 2 (May 2022)
MODESTO BIKE5/31/2022$123.43MODESTO MAY 2022 EXPENDITURESProject 101250 - Neighborhood ADA Program - FY 21/22 CalTrans Indirect Approved Rate Adjustment
MODESTO BIKE6/9/2022$99,915.24MAY 2022 MEASURE L PAYMENT FY2021/22MAY 2022 MEASURE L PAYMENT FY2021/22
MODESTO BIKE6/30/2022$107,118.95FY21-22 MEASURE L MODESTO REVENUE ACCRUAL JULY 2022MEASURE L JULY 2022 REVENUE ACCRUAL
MODESTO BIKE6/30/2022$88,424.36MEASURE L MODESTO JUNE 2022 REVENUE ACCRUALMEASURE L JUNE 2022 REVENUE ACCRUAL
MODESTO BIKE6/30/2022$134.52MEASURE L MODESTO JUNE 2022 REVENUE ACCRUAL INTEREST BIKEMEASURE L JUNE 2022 REVENUE ACCRUAL
MODESTO BIKE6/30/2022$2,164.00MODESTO JUNE 2022 BATCH 3 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design Invoice #2018-114-44 for Additional Services
MODESTO BIKE6/30/2022$1,196.38MODESTO JUNE 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design Invoice #2018-114-43 for Engineering Services
MODESTO BIKE6/30/2022$37.58MODESTO JUNE 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 1 (June 2022)
MODESTO BIKE6/30/2022$118.00MODESTO JUNE 2022 EXPENDITURESProject 101126 - Dry Creek Trail Maintenance. Meyers Nave Invoice #190551
MODESTO BIKE6/30/2022$2,864.87MODESTO JUNE 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 15.8 (June 2022)
MODESTO BIKE6/30/2022$2,779.47MODESTO JUNE 2022 EXPENDITURESProject 101250 - Neighborhood ADA Program. Employee Hours = 13.3 (June 2022)
MODESTO BIKE7/31/2022$1,656.87MODESTO JULY 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 9.3 (July 2022)
MODESTO BIKE7/31/2022$18,959.44MODESTO JULY 2022 EXPENDITURESProject 101180 - Dry Creek Trail Phase II. Employee Hours = 142 (July 2022)
MODESTO BIKE7/31/2022$576.03MODESTO JULY 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 7.3 (July 2022)
MODESTO BIKE8/31/2022$1,079.78MODESTO AUGUST 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design Invoice #2018-114-45 for engineering services
MODESTO BIKE8/31/2022$1,835.22MODESTO AUGUST 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design Invoice #2018-114-45 for engineering services additional services
MODESTO BIKE8/31/2022$421.77MODESTO AUGUST 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 3.5 (August 2022)
MODESTO BIKE8/31/2022$22,621.68MODESTO AUGUST 2022 EXPENDITURESProject 101180 - Dry Creek Trail Phase II. Employee Hours = 177 (August 2022)
MODESTO BIKE8/31/2022$2,376.09MODESTO AUGUST 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 16 (August 2022)
MODESTO BIKE8/31/2022$548.55MODESTO AUGUST 2022 EXPENDITURESProject 101250 - Neighborhood ADA Program. Employee Hours = 3 (August 2022)
MODESTO BIKE9/20/2022$76,354.53MEASURE L PAYMENT FY22-23 AUGUST 2022MEASURE L PAYMENT FY22-23 AUGUST 2022
MODESTO BIKE9/30/2022$5,338.50MODESTO SEPTEMBER 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design Invoice #2018-114-46 for additional engineering services
MODESTO BIKE9/30/2022$19.61MODESTO SEPTEMBER 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 0.5 (September 2022)
MODESTO BIKE9/30/2022$7,263.63MODESTO SEPTEMBER 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 41 (September 2022)
MODESTO BIKE9/30/2022$3,328.69MODESTO SEPTEMBER 2022 EXPENDITURESProject 101250 - Neighborhood ADA Program. Employee Hours = 16.2 (September 2022)
MODESTO BIKE10/18/2022$88,458.00MEASURE L PAYMENT FY22-23 SEPTEMBER 2022 MODESTOMEASURE L PAYMENT FY22-23 SEPTEMBER 2022
MODESTO BIKE10/18/2022$354.91MEASURE L PAYMENT FY22-23 SEPTEMBER 2022 MODESTO INTERESTMEASURE L PAYMENT FY22-23 SEPTEMBER 2022 MODESTO INTEREST
MODESTO BIKE10/31/2022$4,398.00MODESTO OCTOBER 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design Invoice #00-2018-114-47 for additional serivces for ATP plan
MODESTO BIKE10/31/2022$19.61MODESTO OCTOBER 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 0.5 (October 2022)
MODESTO BIKE10/31/2022$81.36MODESTO OCTOBER 2022 EXPENDITURESProject 101126 - Dry Creek Trail Maintenance. Employee Hours = 0.5 (October 2022)
MODESTO BIKE10/31/2022$53,745.10MODESTO OCTOBER 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. American Pavement Systems Inc Invoice #OCT22-PP4-2022-19 for progress payment #4
MODESTO BIKE10/31/2022$4,515.47MODESTO OCTOBER 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 33.5 (October 2022)
MODESTO BIKE10/31/2022$58.79MODESTO OCTOBER 2022 EXPENDITURESProject 101250 - Neighborhood ADA Program. Employee Hours = 1.5 (October 2022)
MODESTO BIKE11/29/2022$94,703.35MEASURE L PAYMENT FY22-23 OCTOBER 2022 MODESTO INTERESTMEASURE L PAYMENT FY22-23 OCTOBER 2022
MODESTO BIKE11/30/2022$2,061.51MODESTO NOVEMBER 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design Invoice #2018-114-48 for additional services for ATP Plan
MODESTO BIKE11/30/2022$58.84MODESTO NOVEMBER 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 1.5 (November 2022)
MODESTO BIKE11/30/2022$488.18MODESTO NOVEMBER 2022 EXPENDITURESProject 101126 - Dry Creek Trail Maintenance. Employee Hours = 3 (November 2022)
MODESTO BIKE11/30/2022$43,912.42MODESTO NOVEMBER 2022 EXPENDITURESProject 101126 - Dry Creek Trail Maintenance. Mcfadden Construction Invoice #NOV22-PP11-2020 for Change Order #1-#4
MODESTO BIKE11/30/2022$83,167.66MODESTO NOVEMBER 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. American Pavement Systems Invoice #NOV22-PP5-2022-19
MODESTO BIKE11/30/2022$16,720.23MODESTO NOVEMBER 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 106.6 (November 2022)
MODESTO BIKE11/30/2022$19.61MODESTO NOVEMBER 2022 EXPENDITURESProject 101250 - Neighborhood ADA Program. Employee Hours = 0.5 (November 2022)
MODESTO BIKE12/13/2022$96,776.35MEASURE L PAYMENT FY22-23 NOVEMBER 2022 MODESTOMEASURE L PAYMENT FY22-23 NOVEMBER 2022 MODESTO
MODESTO BIKE12/31/2022$2,292.00MODESTO DECEMBER 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Alta Planning + Design. Invoice #2018-114-49 for additional services for ATP Project
MODESTO BIKE12/31/2022$2,212.89MODESTO DECEMBER 2022 EXPENDITURESProject 101041 - Active Transportation Plan. Employee Hours = 12.5 (December 2022)
MODESTO BIKE12/31/2022$291.37MODESTO DECEMBER 2022 EXPENDITURESProject 101126 - Dry Creek Trail Maintenance. Employee Hours = 1.5 (December 2022)
MODESTO BIKE12/31/2022$101,201.12MODESTO DECEMBER 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. American Pavement Systems Inc. Invoice #NOV22-PP5-2022-19
MODESTO BIKE12/31/2022$9,541.58MODESTO DECEMBER 2022 EXPENDITURESProject 101247 - Virginia Corridor Trail Maintenance. Employee Hours = 66.5 (December 2022)