Updated on: January 12, 2021 at 9:33 am
Click on the logo to visit City of Waterford’s page |
Contact |
Local Benefits:
Priority | Location | From | Notes |
---|---|---|---|
1 | Summers St | F St to D St | Completed in 2018 |
2 | Church Street | Yosemite to Kadota | Completed in 2018 |
3 | H Street | Yosemite to Dorsey | In Design 2019 Construction 2020/21 |
4 | I Street | Bentley to Main | In Design 2019 Construction 2020/21 |
5 | Main Street | G to Church | In Design 2019 Construction 2020/21 |
6 | G Street | Yosemite to Church | In Design 2019 Construction 2020/21 |
7 | D Street | Bentley to Main | |
8 | E Street | La Gallina to Oden | |
9 | B Street | Bentley to Dorsey | |
10 | Welch St | Loy, Barnes, Tohara | |
11 | Harriett Drive | Bentley to Enid | |
12 | Kadota Avenue | Pasadena to Western | |
13 | Hickman Street | Baker to N.Appling |
Click here for a list of Revenues and Expenditures
Expediture Effective Date Revenue Expense Transaction Description Document Description
WATERFORD STREETS 2/22/2018 163,733.81 WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1 WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1
WATERFORD STREETS 3/12/2018 22,680.23 MEASURE L WATERFORD ML18-21, FEBRUARY 2018 PMT #2 MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD STREETS 4/24/2018 28,323.71 MEASURE L WATERFORD ML18-31, MARCH 2018 PMT #3 MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
WATERFORD STREETS 5/29/2018 14,370.00 Waterford Expenses to 5-29-2018 Summers Street Reconstruction Engineering
WATERFORD STREETS 5/29/2018 16,354.66 MEASURE L WATERFORD ML18-42, APRIL 2018 PMT #4 MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
WATERFORD STREETS 6/25/2018 27,352.42 MEASURE L WATERFORD ML18-52, MAY 2018 PAYMENT #5 FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD STREETS 6/30/2018 3,745.00 Waterford Expenses 5-30 to 6-30-2018 Summer Street
WATERFORD STREETS 7/24/2018 20,173.91 MEASURE L WATERFORD ML19-09, JUNE 2018 PMT #1 FY18-19 MEAURE L JUNE 2018, PAYMENT #1
WATERFORD STREETS 8/21/2018 21,925.95 MEASURE L WATERFORD ML19-20, JULY 2018 PMT #1 FY18-19 MEAURE L JULY 2018, PAYMENT #1
WATERFORD STREETS 8/31/2018 185,214.48 Waterford August 2018 Expenditures - Summer Street Reconst.
WATERFORD STREETS 9/18/2018 19,735.65 MEASURE L WATERFORD ML19-31, AUGUST 2018 PMT #2 FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
WATERFORD STREETS 10/24/2018 22,461.32 MEASURE L SEPTEMBER 2018 PAYMENT MEASURE L WATERFORD ML19-42, SEPTEMBER 2018 PMT #3
WATERFORD STREETS 10/30/2018 30,587.33 Waterford September 2018 Expenses Summer Street Reconstruction
WATERFORD STREETS 11/19/2018 29,792.37 MEASURE L WATERFORD ML19-53, OCTOBER 2018 PMT #4 MEASURE L OCTOBER 2018 PAYMENT
WATERFORD STREETS 11/30/2018 4,165.00 Waterford November 2018 Expenses Summer Street Project
WATERFORD STREETS 12/4/2018 96,423.19 Waterford October 2018 Expenses Summer Street Project
WATERFORD STREETS 12/19/2018 24,168.36 MEASURE L WATERFORD ML19-64, NOVEMBER 2018 PMT #5 MEASURE L NOVEMBER 2018 PAYMENT
WATERFORD STREETS 1/24/2019 24,181.05 MEASURE L WATERFORD ML19-75, DECEMBER 2018 PMT #6 MEASURE L DECEMBER 2018 PAYMENT
WATERFORD STREETS 1/31/2019 62,760.13 Waterford Jan 2019 Expenditures Summer Street
WATERFORD STREETS 2/27/2019 24,257.96 MEASURE L WATERFORD ML19-86, JANUARY 2019 PMT #7 MEASURE L JANUARY 2019 PAYMENT
WATERFORD STREETS 2/28/2019 22,228.78 Waterford Feb 2019 Expenditures Summer Street Construction
WATERFORD STREETS 3/19/2019 25,015.52 MEASURE L WATERFORD ML19-96, FEBRUARY 2019 PMT #8 MEASURE L FEBRUARY 2019 PAYMENT
WATERFORD STREETS 3/31/2019 705.00 Waterford March 2019 Expenditures Summer Street Engineering
WATERFORD STREETS 4/17/2019 23,223.61 MEASURE L WATERFORD ML19-106, MARCH 2019 PMT #9 MEASURE L MARCH 2019 PAYMENT
WATERFORD STREETS 5/24/2019 23,957.80 MEASURE L WATERFORD ML19-117, APRIL 2019 PMT #10 MEASURE L APRIL 2019 PAYMENT
WATERFORD STREETS 6/20/2019 19,257.16 MEASURE L WATERFORD ML19-127, MAY 2019 PMT #11 MEASURE L MAY 2019 PAYMENT
WATERFORD STREETS 6/30/2019 123,538.89 Waterford June 2019 Expenditures - Church Street Reconstruct
WATERFORD STREETS 6/30/2019 4,717.50 Waterford June 2019 Expenditures - Main Street G, H, & I
WATERFORD STREETS 6/30/2019 6,095.00 Correct June Posting
WATERFORD STREETS 7/23/2019 22,907.84 MEASURE L WATERFORD ML19-137, JUNE 2019 PMT #12 FY18/19 MEASURE L PAYMENT; JUNE 2019
WATERFORD STREETS 8/28/2019 26,542.34 MEASURE L FY19-20 WATERFORD ML20-09, JULY 2019 PMT #1 STANCOG MEASURE L PAYMENT; JUNE 2019
WATERFORD STREETS 9/25/2019 23,008.17 MEASURE L FY19-20 WATERFORD ML20-20, AUGUST 2019 PMT #2 STANCOG MEASURE L PAYMENT; AUGUST 2019
WATERFORD STREETS 11/4/2019 23,565.44 MEASURE L FY19-20 WATERFORD ML20-31, SEPTEMBER 2019 PMT #3 STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
WATERFORD STREETS 11/21/2019 28,246.87 MEASURE L FY19-20 WATERFORD ML20-42, OCTOBER 2019 PMT #4 STANCOG MEASURE L PAYMENT; OCTOBER 2019
WATERFORD STREETS 12/17/2019 23,389.19 MEASURE L FY19-20 WATERFORD ML20-53, NOVEMBER 2019 PMT #5 STANCOG MEASURE L PAYMENT; NOVEMBER 2019
WATERFORD STREETS 12/31/2019 4,605.00 Main Street G, H, and I Main G H and I Engineering Costs
WATERFORD STREETS 1/29/2020 23,271.56 MEASURE L FY19-20 WATERFORD ML20-64, DECEMBER 2019 PMT #6 STANCOG MEASURE L PAYMENT; DECEMBER 2019
WATERFORD STREETS 2/24/2020 23,702.19 MEASURE L FY19-20 WATERFORD ML20-75, JANUARY 2020 PMT #7 STANCOG MEASURE L PAYMENT; JANUARY 2020
WATERFORD STREETS 3/12/2020 31,539.77 MEASURE L FY19-20 WATERFORD ML20-86, FEBRUARY 2020 PMT #8 STANCOG MEASURE L PAYMENT; FEBRUARY 2020
WATERFORD STREETS 4/28/2020 20,407.64 MEASURE L FY19-20 WATERFORD ML20-97, MARCH 2020 PMT #9 STANCOG MEASURE L PAYMENT; MARCH 2020
WATERFORD STREETS 5/28/2020 20,442.91 MEASURE L FY19-20 WATERFORD ML20-108, APRIL 2020 PMT #10 STANCOG MEASURE L PAYMENT; APRIL 2020
WATERFORD STREETS 6/23/2020 18,266.73 MEASURE L FY19-20 WATERFORD ML20-119, MAY 2020 PMT #11 STANCOG MEASURE L PAYMENT; MAY 2020
WATERFORD STREETS 6/30/2020 6,885.00 WATERFORD EXPENSES TO JUNE 30 2020 Main G H and I Engineering Costs
WATERFORD STREETS 6/30/2020 29,575.60 MEASURE L WATERFORD JULY 2020 REVENUE ACCRUAL FY19/20 REVENUE ACCRUAL JULY REVENUE
WATERFORD STREETS 6/30/2020 19,880.81 MEASURE L WATERFORD JUNE 2020 REVENUE FY19/20 REVENUE
WATERFORD TRAFFIC 2/22/2018 32,746.76 WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1 WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1
WATERFORD TRAFFIC 3/12/2018 4,536.05 MEASURE L WATERFORD ML18-21, FEBRUARY 2018 PMT #2 MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD TRAFFIC 4/24/2018 5,664.74 MEASURE L WATERFORD ML18-31, MARCH 2018 PMT #3 MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
WATERFORD TRAFFIC 5/29/2018 3,270.93 MEASURE L WATERFORD ML18-42, APRIL 2018 PMT #4 MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
WATERFORD TRAFFIC 6/25/2018 5,470.48 MEASURE L WATERFORD ML18-52, MAY 2018 PAYMENT #5 FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD TRAFFIC 7/24/2018 4,034.78 MEASURE L WATERFORD ML19-09, JUNE 2018 PMT #1 FY18-19 MEAURE L JUNE 2018, PAYMENT #1
WATERFORD TRAFFIC 8/21/2018 4,385.19 MEASURE L WATERFORD ML19-20, JULY 2018 PMT #1 FY18-19 MEAURE L JULY 2018, PAYMENT #1
WATERFORD TRAFFIC 9/18/2018 3,947.13 MEASURE L WATERFORD ML19-31, AUGUST 2018 PMT #2 FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
WATERFORD TRAFFIC 10/24/2018 4,492.26 MEASURE L SEPTEMBER 2018 PAYMENT MEASURE L WATERFORD ML19-42, SEPTEMBER 2018 PMT #3
WATERFORD TRAFFIC 11/19/2018 5,958.47 MEASURE L WATERFORD ML19-53, OCTOBER 2018 PMT #4 MEASURE L OCTOBER 2018 PAYMENT
WATERFORD TRAFFIC 12/19/2018 4,833.67 MEASURE L WATERFORD ML19-64, NOVEMBER 2018 PMT #5 MEASURE L NOVEMBER 2018 PAYMENT
WATERFORD TRAFFIC 1/24/2019 4,836.21 MEASURE L WATERFORD ML19-75, DECEMBER 2018 PMT #6 MEASURE L DECEMBER 2018 PAYMENT
WATERFORD TRAFFIC 2/27/2019 4,851.59 MEASURE L WATERFORD ML19-86, JANUARY 2019 PMT #7 MEASURE L JANUARY 2019 PAYMENT
WATERFORD TRAFFIC 3/19/2019 5,003.10 MEASURE L WATERFORD ML19-96, FEBRUARY 2019 PMT #8 MEASURE L FEBRUARY 2019 PAYMENT
WATERFORD TRAFFIC 4/17/2019 4,644.72 MEASURE L WATERFORD ML19-106, MARCH 2019 PMT #9 MEASURE L MARCH 2019 PAYMENT
WATERFORD TRAFFIC 5/24/2019 4,791.56 MEASURE L WATERFORD ML19-117, APRIL 2019 PMT #10 MEASURE L APRIL 2019 PAYMENT
WATERFORD TRAFFIC 6/20/2019 3,851.43 MEASURE L WATERFORD ML19-127, MAY 2019 PMT #11 MEASURE L MAY 2019 PAYMENT
WATERFORD TRAFFIC 7/23/2019 4,581.57 MEASURE L WATERFORD ML19-137, JUNE 2019 PMT #12 FY18/19 MEASURE L PAYMENT; JUNE 2019
WATERFORD TRAFFIC 8/28/2019 5,308.47 MEASURE L FY19-20 WATERFORD ML20-09, JULY 2019 PMT #1 STANCOG MEASURE L PAYMENT; JUNE 2019
WATERFORD TRAFFIC 9/25/2019 4,601.63 MEASURE L FY19-20 WATERFORD ML20-20, AUGUST 2019 PMT #2 STANCOG MEASURE L PAYMENT; AUGUST 2019
WATERFORD TRAFFIC 11/4/2019 4,713.09 MEASURE L FY19-20 WATERFORD ML20-31, SEPTEMBER 2019 PMT #3 STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
WATERFORD TRAFFIC 11/21/2019 5,649.37 MEASURE L FY19-20 WATERFORD ML20-42, OCTOBER 2019 PMT #4 STANCOG MEASURE L PAYMENT; OCTOBER 2019
WATERFORD TRAFFIC 12/17/2019 4,677.84 MEASURE L FY19-20 WATERFORD ML20-53, NOVEMBER 2019 PMT #5 STANCOG MEASURE L PAYMENT; NOVEMBER 2019
WATERFORD TRAFFIC 1/29/2020 4,654.31 MEASURE L FY19-20 WATERFORD ML20-64, DECEMBER 2019 PMT #6 STANCOG MEASURE L PAYMENT; DECEMBER 2019
WATERFORD TRAFFIC 2/24/2020 4,740.44 MEASURE L FY19-20 WATERFORD ML20-75, JANUARY 2020 PMT #7 STANCOG MEASURE L PAYMENT; JANUARY 2020
WATERFORD TRAFFIC 3/12/2020 6,307.95 MEASURE L FY19-20 WATERFORD ML20-86, FEBRUARY 2020 PMT #8 STANCOG MEASURE L PAYMENT; FEBRUARY 2020
WATERFORD TRAFFIC 4/28/2020 4,081.53 MEASURE L FY19-20 WATERFORD ML20-97, MARCH 2020 PMT #9 STANCOG MEASURE L PAYMENT; MARCH 2020
WATERFORD TRAFFIC 5/28/2020 4,088.58 MEASURE L FY19-20 WATERFORD ML20-108, APRIL 2020 PMT #10 STANCOG MEASURE L PAYMENT; APRIL 2020
WATERFORD TRAFFIC 6/23/2020 3,653.35 MEASURE L FY19-20 WATERFORD ML20-119, MAY 2020 PMT #11 STANCOG MEASURE L PAYMENT; MAY 2020
WATERFORD TRAFFIC 6/30/2020 5,915.12 MEASURE L WATERFORD JULY 2020 REVENUE ACCRUAL FY19/20 REVENUE ACCRUAL JULY REVENUE
WATERFORD TRAFFIC 6/30/2020 3,976.16 MEASURE L WATERFORD JUNE 2020 REVENUE FY19/20 REVENUE
WATERFORD BIKE 2/22/2018 16,373.38 WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1 WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1
WATERFORD BIKE 3/12/2018 2,268.02 MEASURE L WATERFORD ML18-21, FEBRUARY 2018 PMT #2 MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD BIKE 4/24/2018 2,832.37 MEASURE L WATERFORD ML18-31, MARCH 2018 PMT #3 MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
WATERFORD BIKE 5/29/2018 1,635.47 MEASURE L WATERFORD ML18-42, APRIL 2018 PMT #4 MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
WATERFORD BIKE 6/25/2018 2,735.24 MEASURE L WATERFORD ML18-52, MAY 2018 PAYMENT #5 FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD BIKE 7/24/2018 2,017.39 MEASURE L WATERFORD ML19-09, JUNE 2018 PMT #1 FY18-19 MEAURE L JUNE 2018, PAYMENT #1
WATERFORD BIKE 8/21/2018 2,192.59 MEASURE L WATERFORD ML19-20, JULY 2018 PMT #1 FY18-19 MEAURE L JULY 2018, PAYMENT #1
WATERFORD BIKE 9/18/2018 1,973.56 MEASURE L WATERFORD ML19-31, AUGUST 2018 PMT #2 FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
WATERFORD BIKE 10/24/2018 2,246.13 MEASURE L SEPTEMBER 2018 PAYMENT MEASURE L WATERFORD ML19-42, SEPTEMBER 2018 PMT #3
WATERFORD BIKE 11/19/2018 2,979.24 MEASURE L WATERFORD ML19-53, OCTOBER 2018 PMT #4 MEASURE L OCTOBER 2018 PAYMENT
WATERFORD BIKE 12/19/2018 2,416.84 MEASURE L WATERFORD ML19-64, NOVEMBER 2018 PMT #5 MEASURE L NOVEMBER 2018 PAYMENT
WATERFORD BIKE 1/24/2019 2,418.10 MEASURE L WATERFORD ML19-75, DECEMBER 2018 PMT #6 MEASURE L DECEMBER 2018 PAYMENT
WATERFORD BIKE 1/31/2019 57,055.75 Waterford Jan 2019 Expenditures Summer Street
WATERFORD BIKE 2/27/2019 2,425.80 MEASURE L WATERFORD ML19-86, JANUARY 2019 PMT #7 MEASURE L JANUARY 2019 PAYMENT
WATERFORD BIKE 3/19/2019 2,501.55 MEASURE L WATERFORD ML19-96, FEBRUARY 2019 PMT #8 MEASURE L FEBRUARY 2019 PAYMENT
WATERFORD BIKE 4/17/2019 2,322.36 MEASURE L WATERFORD ML19-106, MARCH 2019 PMT #9 MEASURE L MARCH 2019 PAYMENT
WATERFORD BIKE 5/24/2019 2,395.78 MEASURE L WATERFORD ML19-117, APRIL 2019 PMT #10 MEASURE L APRIL 2019 PAYMENT
WATERFORD BIKE 6/20/2019 1,925.72 MEASURE L WATERFORD ML19-127, MAY 2019 PMT #11 MEASURE L MAY 2019 PAYMENT
WATERFORD BIKE 6/30/2019 (6,095.00) Correct June Posting
WATERFORD BIKE 7/23/2019 2,290.78 MEASURE L WATERFORD ML19-137, JUNE 2019 PMT #12 FY18/19 MEASURE L PAYMENT; JUNE 2019
WATERFORD BIKE 8/28/2019 2,654.23 MEASURE L FY19-20 WATERFORD ML20-09, JULY 2019 PMT #1 STANCOG MEASURE L PAYMENT; JUNE 2019
WATERFORD BIKE 9/25/2019 2,300.82 MEASURE L FY19-20 WATERFORD ML20-20, AUGUST 2019 PMT #2 STANCOG MEASURE L PAYMENT; AUGUST 2019
WATERFORD BIKE 11/4/2019 2,356.54 MEASURE L FY19-20 WATERFORD ML20-31, SEPTEMBER 2019 PMT #3 STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
WATERFORD BIKE 11/21/2019 2,824.69 MEASURE L FY19-20 WATERFORD ML20-42, OCTOBER 2019 PMT #4 STANCOG MEASURE L PAYMENT; OCTOBER 2019
WATERFORD BIKE 12/17/2019 2,338.92 MEASURE L FY19-20 WATERFORD ML20-53, NOVEMBER 2019 PMT #5 STANCOG MEASURE L PAYMENT; NOVEMBER 2019
WATERFORD BIKE 1/29/2020 2,327.16 MEASURE L FY19-20 WATERFORD ML20-64, DECEMBER 2019 PMT #6 STANCOG MEASURE L PAYMENT; DECEMBER 2019
WATERFORD BIKE 2/24/2020 2,370.22 MEASURE L FY19-20 WATERFORD ML20-75, JANUARY 2020 PMT #7 STANCOG MEASURE L PAYMENT; JANUARY 2020
WATERFORD BIKE 3/12/2020 3,153.98 MEASURE L FY19-20 WATERFORD ML20-86, FEBRUARY 2020 PMT #8 STANCOG MEASURE L PAYMENT; FEBRUARY 2020
WATERFORD BIKE 4/28/2020 2,040.76 MEASURE L FY19-20 WATERFORD ML20-97, MARCH 2020 PMT #9 STANCOG MEASURE L PAYMENT; MARCH 2020
WATERFORD BIKE 5/28/2020 2,044.29 MEASURE L FY19-20 WATERFORD ML20-108, APRIL 2020 PMT #10 STANCOG MEASURE L PAYMENT; APRIL 2020
WATERFORD BIKE 6/23/2020 1,826.67 MEASURE L FY19-20 WATERFORD ML20-119, MAY 2020 PMT #11 STANCOG MEASURE L PAYMENT; MAY 2020
WATERFORD BIKE 6/30/2020 2,957.56 MEASURE L WATERFORD JULY 2020 REVENUE ACCRUAL FY19/20 REVENUE ACCRUAL JULY REVENUE
WATERFORD BIKE 6/30/2020 1,988.08 MEASURE L WATERFORD JUNE 2020 REVENUE FY19/20 REVENUE