Updated on: October 14, 2020 at 11:30 am

Click on the logo to visit Stanislaus County’s page

Contact

David Leamon
Public Works Director
Stanislaus County
1716 Morgan Road
Modesto, CA 95358
(209) 525-4302
email

County Benefits:

The County will be able to resurface EVERY road in the unincorporated area of the County three times over the course of the life of the measure.

  • ​3,085 Miles of Chip Seal
  • 845 Miles of Slurry Seal
  • 325 Miles of Overlay
  • 50 miles of Reconstructed Roads.​

Click here for a list of Revenues and Expenditures


ExpenditureEffective DateRevenueExpenseTransaction DescriptionDocument Description
STAN COUNTY STREETS2/6/2018 3,505,982.95 COUNTY ML18-10, JUNE2017-JAN2018 PMT#1COUNTY ML18-10, JUNE2017-JAN2018 PMT#1
STAN COUNTY STREETS3/12/2018 4,174,854.62 2017 Chip Seal, 2017 Salida Pavement Pres., 2018 Pavement
STAN COUNTY STREETS3/12/2018 485,644.86 MEASURE L STANISLAUS COUNTY ML18-22, FEBRUARY 2018 PMT #2MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY STREETS4/12/2018 32,782.99 2018 Chip Seal, 2018 Pavement Preservation, Roadway Reconstr
STAN COUNTY STREETS4/24/2018 606,487.14 MEASURE L STANISLAUS COUNTY ML18-32, MARCH 2018 PMT #3MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY STREETS5/10/2018 51,352.20 StanCo, 2018 Chip Seal, Salida Pavement, 2018 Pavement Pres.
STAN COUNTY STREETS5/29/2018 350,197.43 MEASURE L STANISLAUS COUNTY ML18-43, APRIL 2018 PMT #4MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY STREETS6/8/2018 892,041.50 StanCO - 2017/2018 Chip, Salida Pavement, 2018 Pavement Pres
STAN COUNTY STREETS6/25/2018 585,689.09 MEASURE L STANISLAUS COUNTY ML18-53, MAY 2018 PAYMENT #5FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY STREETS7/11/2018 956,472.74 Chip Seal, Pavement Preservation, Reservoir Rd, Urban Pvmt
STAN COUNTY STREETS7/24/2018 431,977.87 MEASURE L STANISLAUS COUNTY ML19-10, JUNE 2018 PMT #1FY18-19 MEAURE L JUNE 2018, PAYMENT #1
STAN COUNTY STREETS8/10/2018 565,162.38 Chip Seal, Pavement Preservation, Urban Preservation,Ladd @ St Johns
STAN COUNTY STREETS8/21/2018 469,493.68 MEASURE L STANISLAUS COUNTY ML19-21, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
STAN COUNTY STREETS9/11/2018 1,615,213.13 2018 Chip, 2018 PP, Diablo Grande, Urban Pvmnt, Ladd@St John
STAN COUNTY STREETS9/18/2018 422,593.46 MEASURE L STANISLAUS COUNTY ML19-32, AUGUST 2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
STAN COUNTY STREETS9/30/2018 1,048,086.77 CHIP SEAL, PAVEMENT PRESERVATION, LADD @ ST JOHNS, MITCHELL& QUINCY ROADS
STAN COUNTY STREETS10/24/2018 480,957.37 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L STANISLAUS COUNTY ML19-43, SEPTEMBER 2018 PMT #3
STAN COUNTY STREETS11/9/2018 32,986.39 Chip Seal and Urban Preservation
STAN COUNTY STREETS11/19/2018 637,935.08 MEASURE L STANISLAUS COUNTY ML19-54, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
STAN COUNTY STREETS12/11/2018 81,424.89 StanCounty Nov 2018 Expenditures2018 Pavement Preservation, Diable Grande Parkway, Urban Pavement Preservation, Ladd @ St Johns
STAN COUNTY STREETS12/19/2018 517,509.84 MEASURE L STANISLAUS COUNTY ML19-65, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
STAN COUNTY STREETS1/14/2019 41,357.35 2018 and 2019 Pavement Preservation and Ladd @ St Johns
STAN COUNTY STREETS1/24/2019 517,781.43 MEASURE L STANISLAUS COUNTY ML19-76, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
STAN COUNTY STREETS2/8/2019 446,463.69 2019 Chip, 2018 Urban PP, 2019 Urban PP, Mitchell and Quincy
STAN COUNTY STREETS2/27/2019 519,428.39 MEASURE L STANISLAUS COUNTY ML19-87, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
STAN COUNTY STREETS3/8/2019 208,038.37 2019 Chip, 2018/2019/2020 Urban PP, Ladd @ St Johns
STAN COUNTY STREETS3/19/2019 535,649.72 MEASURE L STANISLAUS COUNTY ML19-97, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
STAN COUNTY STREETS4/10/2019 171,343.24 2019 Chip, 2020 Urban, 2018 Urban, 2019 Urban, St Johns @Ladd, Mitchall and Quincy Roads
STAN COUNTY STREETS4/10/2019 12,151.88 2019 Chip, 2020 Urban, 2018 Urban, 2019 Urban, St Johns @Ladd, Mitchell and Quincy Roads
STAN COUNTY STREETS4/17/2019 497,280.17 MEASURE L STANISLAUS COUNTY ML19-107, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
STAN COUNTY STREETS5/8/2019 14,414.75 2019 Chip, Urban Pavement
STAN COUNTY STREETS5/8/2019 256,008.43 2019 Chip, Urban Pavement Preservation
STAN COUNTY STREETS5/24/2019 513,001.14 MEASURE L STANISLAUS COUNTY ML19-118, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
STAN COUNTY STREETS5/31/2019 12,445.04 May 2019 Measure L Expenditures
STAN COUNTY STREETS5/31/2019 11,236.00 May 2019 Measure L Expenditures2018 Urban Pavement Preservation, 2019 Urban Pavement Preservation
STAN COUNTY STREETS6/20/2019 412,347.69 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
STAN COUNTY STREETS6/30/2019 8,094.50 June 2019 Measure L Expenditures
STAN COUNTY STREETS6/30/2019 10,674.37 June 2019 Measure L Expenditures2019 Chip Seal, 2020 Urban Pavement Preservation, 2018 Urban Pavement Preservation, Diablo Grande Parkway Resurfacing, 2019 Urban Pavement Preservation, Ladd @ St Johns.
STAN COUNTY STREETS6/30/2019650.00June 2019 Measure L ExpendituresLadd @ St Johns.
STAN COUNTY STREETS7/23/2019 490,518.58 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11FY18/19 MEASURE L PAYMENT; JUNE 2019
STAN COUNTY STREETS8/28/2019 568,343.17 MEASURE L FY19-20 STANISLAUS COUNTY ML20-10, JULY 2019 PMT#1STANCOG MEASURE L PAYMENT; JUNE 2019
STAN COUNTY STREETS9/25/2019 492,666.91 MEASURE L FY19-20 STANISLAUS COUNTY ML20-21, AUG 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
STAN COUNTY STREETS9/30/2019 1,469.00 September 19 Measure L Expenditures2018 Urban Pavement Preservation, Ladd @ St Johns.
STAN COUNTY STREETS9/30/2019 376,337.77 September 19 Measure L Expenditures2019 Chip Seal, 2018 Urban Pavement Preservation.
STAN COUNTY STREETS10/31/2019 776,588.37 October 19 Measure L Expenditures2019 Chip Seal and 2018 Urban Pavement Preservation projects, multiple locations
STAN COUNTY STREETS11/4/2019 504,599.74 MEASURE L FY19-20 STAN COUNTY ML20-32, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
STAN COUNTY STREETS11/21/2019 604,841.63 MEASURE L FY19-20 STAN COUNTY ML20-43, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
STAN COUNTY STREETS11/30/2019 88,816.40 ML Expenditures November 20192019 Chip Seal Project
STAN COUNTY STREETS11/30/2019 26,692.58 ML Expenditures November 20192019 Chip Seal, 2020 Urban Pavement Preservation, 2018 Urban Pavement Preservation, Diablo Grande Parkway Resurfacing projects
STAN COUNTY STREETS12/17/2019 500,825.63 MEASURE L FY19-20 STAN COUNTY ML20-54, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
STAN COUNTY STREETS12/31/2019 16,452.27 ML Expenditures December 192019 Chip Seal Project
STAN COUNTY STREETS1/29/2020 498,306.90 MEASURE L FY19-20 STAN COUNTY ML20-65, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
STAN COUNTY STREETS1/31/2020 5,061.97 January 20 Measure L Expenditures2018 Urban Pavement Preservation, Ladd @ St Johns
STAN COUNTY STREETS1/31/2020 13,198.46 January 20 Measure L Expenditures2019 Chip Seal, 2020 Urban Pavement Preservation, 2018 Urban Pavement Preservation, Diablo Grande Parkway Resurfacing, 2019 Urban Pavement Preservation
STAN COUNTY STREETS1/31/2020 1,165,190.25 January 20 Measure L ExpendituresRoads Ops - Force Account FY1920: Arnold Avenue, Euclid Avenue, Mitchell Road, Powell Road, Tim Bell Road and Zeering Road.
STAN COUNTY STREETS2/24/2020 507,527.84 MEASURE L FY19-20 STAN COUNTY ML20-76, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
STAN COUNTY STREETS2/28/2020 1,481,286.78 Measure L Expenditures - FY1819 Adjustment
STAN COUNTY STREETS2/29/2020 43,946.08 ML Expenditures February 202018,2019 & 2020 Urban Preserv.,Ladd St & St Johns,Mitchell &Quincy Rd, 2019 & 2020 Chip Seal Proj., 2019 ADA Curb Ramp Proj.
STAN COUNTY STREETS2/29/2020 409,209.37 ML Expenditures February 202019 Chip Seal Project
STAN COUNTY STREETS2/29/2020 1,020,422.06 ML Expenditures February 202019 Chip Seal Project, 2019 ADACurb Ramp Proj.
STAN COUNTY STREETS3/12/2020 675,351.59 MEASURE L FY19-20 STAN COUNTY ML20-87, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
STAN COUNTY STREETS3/31/2020 2,386.16 ML Expenditures March 202019 Urban Pavem Preservation, Ladd & St Johns, 2019 ADA Curb Ramp project
STAN COUNTY STREETS4/28/2020 436,982.54 MEASURE L FY19-20 STAN COUNTY ML20-98, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020
STAN COUNTY STREETS4/30/2020 246,979.55 ML Expenditures April 202019 Urban Pavement Preservation, Ladd @ St Johns, 2019 ADA Curb Ramp project
STAN COUNTY STREETS5/28/2020 437,737.88 MEASURE L FY19-20 STAN COUNTY ML20-109, APRIL 2020 PMT #10STANCOG MEASURE L PAYMENT; APRIL 2020
STAN COUNTY STREETS5/31/2020 25,520.34 ML Expenditures May 202020 Urban Preservation, Diablo GRande Parkway Resurfacing, 2019 Urban Pavement Preservation, Ladd @ St Johns, 2019 ADA Curb Ramp project
STAN COUNTY STREETS6/23/2020 391,139.90 MEASURE L FY19-20 STAN COUNTY ML20-120, MAY 2020 PMT #11STANCOG MEASURE L PAYMENT; MAY 2020
STAN COUNTY STREETS6/30/2020 167,995.31 ML Expenditures June 202019 Urban Pavement Preservation, Road Ops: Arnold Ave, Euclid Ave, Mitchell Rd, Powell Rd, Tim Bell.
STAN COUNTY STREETS6/30/2020 100,611.13 ML Expenditures June 202020 Urban Pavement Preservation, Diablo Grande Parkway Resurfacing, 2019 Urban Pavement Preservation, Ladd @ St Johns, 2020 Chip Seal,
STAN COUNTY STREETS6/30/2020 794,201.62 ML Expenditures June 202020 Urban Pavement Preservation, Ladd@ St Johns, 2020 Chip Seal,
STAN COUNTY STREETS6/30/2020 534,397.44 ML Expenditures June 202019 Urban Pavement Preservation, 2020 Chip Seal, Road Ops: Arnold Ave, Euclid Ave, Mitchell Rd, Powell Rd, Tim Bell.
STAN COUNTY STREETS6/30/2020 633,293.44 MEASURE L STANISLAUS COUNTY JULY 2020 REVENUE ACCRUALFY19/20 REVENUE ACCRUAL JULY REVENUE
STAN COUNTY STREETS6/30/2020 425,701.78 MEASURE L STANISLAUS COUNTY JUNE 2020 REVENUEFY19/20 REVENUE
STAN COUNTY TRAFFIC2/6/2018 701,196.60 COUNTY ML18-10, JUNE2017-JAN2018 PMT#1COUNTY ML18-10, JUNE2017-JAN2018 PMT#1
STAN COUNTY TRAFFIC3/12/2018 97,128.97 MEASURE L STANISLAUS COUNTY ML18-22, FEBRUARY 2018 PMT #2MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY TRAFFIC4/24/2018 121,297.43 MEASURE L STANISLAUS COUNTY ML18-32, MARCH 2018 PMT #3MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY TRAFFIC5/29/2018 70,039.49 MEASURE L STANISLAUS COUNTY ML18-43, APRIL 2018 PMT #4MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY TRAFFIC6/25/2018 117,137.82 MEASURE L STANISLAUS COUNTY ML18-53, MAY 2018 PAYMENT #5FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY TRAFFIC7/24/2018 86,395.57 MEASURE L STANISLAUS COUNTY ML19-10, JUNE 2018 PMT #1FY18-19 MEAURE L JUNE 2018, PAYMENT #1
STAN COUNTY TRAFFIC8/21/2018 93,898.74 MEASURE L STANISLAUS COUNTY ML19-21, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
STAN COUNTY TRAFFIC9/18/2018 84,518.69 MEASURE L STANISLAUS COUNTY ML19-32, AUGUST 2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
STAN COUNTY TRAFFIC10/24/2018 96,191.47 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L STANISLAUS COUNTY ML19-43, SEPTEMBER 2018 PMT #3
STAN COUNTY TRAFFIC11/19/2018 127,587.02 MEASURE L STANISLAUS COUNTY ML19-54, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
STAN COUNTY TRAFFIC12/19/2018 103,501.97 MEASURE L STANISLAUS COUNTY ML19-65, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
STAN COUNTY TRAFFIC1/24/2019 103,556.29 MEASURE L STANISLAUS COUNTY ML19-76, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
STAN COUNTY TRAFFIC2/27/2019 103,885.68 MEASURE L STANISLAUS COUNTY ML19-87, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
STAN COUNTY TRAFFIC3/19/2019 107,129.94 MEASURE L STANISLAUS COUNTY ML19-97, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
STAN COUNTY TRAFFIC4/10/2019600.72Traffic Signal Modification, Traffic Signal/ITS
STAN COUNTY TRAFFIC4/17/2019 99,456.03 MEASURE L STANISLAUS COUNTY ML19-107, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
STAN COUNTY TRAFFIC5/24/2019 102,600.23 MEASURE L STANISLAUS COUNTY ML19-118, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
STAN COUNTY TRAFFIC5/31/2019650.78May 2019 Measure L ExpendituresTraffic Signal Modification, Traffic Signal/ITS
STAN COUNTY TRAFFIC6/20/2019 82,469.54 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
STAN COUNTY TRAFFIC6/30/2019 1,200,000.00 Expenditures Adjustment June 2019
STAN COUNTY TRAFFIC6/30/2019 11,713.17 June 2019 Measure L ExpendituresTraffic Signal/ITS
STAN COUNTY TRAFFIC7/23/2019 98,103.72 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11FY18/19 MEASURE L PAYMENT; JUNE 2019
STAN COUNTY TRAFFIC8/28/2019 113,668.63 MEASURE L FY19-20 STANISLAUS COUNTY ML20-10, JULY 2019 PMT#1STANCOG MEASURE L PAYMENT; JUNE 2019
STAN COUNTY TRAFFIC8/31/2019 19,002.28 August Measure L Expenditures
STAN COUNTY TRAFFIC9/25/2019 98,533.38 MEASURE L FY19-20 STANISLAUS COUNTY ML20-21, AUG 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
STAN COUNTY TRAFFIC10/31/2019 1,181.23 October 19 Measure L ExpendituresLadd @ St Johns
STAN COUNTY TRAFFIC11/4/2019 100,919.95 MEASURE L FY19-20 STAN COUNTY ML20-32, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
STAN COUNTY TRAFFIC11/21/2019 120,968.33 MEASURE L FY19-20 STAN COUNTY ML20-43, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
STAN COUNTY TRAFFIC11/30/2019 2,693.20 ML Expenditures November 2019Traffic Signal/ITS
STAN COUNTY TRAFFIC1/29/2020 99,661.38 MEASURE L FY19-20 STAN COUNTY ML20-65, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
STAN COUNTY TRAFFIC1/31/2020515.64January 20 Measure L ExpendituresTraffic Signal/ITS
STAN COUNTY TRAFFIC12/17/2019 100,165.13 MEASURE L FY19-20 STAN COUNTY ML20-54, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
STAN COUNTY TRAFFIC2/24/2020 101,505.57 MEASURE L FY19-20 STAN COUNTY ML20-76, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
STAN COUNTY TRAFFIC2/28/2020 (11,713.17)Measure L Expenditures - FY1819 Adjustment
STAN COUNTY TRAFFIC2/29/2020 1,910.63 ML Expenditures February 20Traffic Signal/ ITC
STAN COUNTY TRAFFIC3/12/2020 135,070.32 MEASURE L FY19-20 STAN COUNTY ML20-87, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
STAN COUNTY TRAFFIC4/28/2020 87,396.51 MEASURE L FY19-20 STAN COUNTY ML20-98, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020
STAN COUNTY TRAFFIC4/30/2020 455,166.84 ML Expenditures April 20Carpenter @ Whitmore Ave Intersection - Signal
STAN COUNTY TRAFFIC5/28/2020 87,547.58 MEASURE L FY19-20 STAN COUNTY ML20-109, APRIL 2020 PMT #10STANCOG MEASURE L PAYMENT; APRIL 2020
STAN COUNTY TRAFFIC5/31/2020378.95ML Expenditures May 20Traffic Signal Modification
STAN COUNTY TRAFFIC6/23/2020 78,227.98 MEASURE L FY19-20 STAN COUNTY ML20-120, MAY 2020 PMT #11STANCOG MEASURE L PAYMENT; MAY 2020
STAN COUNTY TRAFFIC6/30/2020 500,000.00 ML Expenditures June 20Carpenter Rd @ Whitmore Ave Intersection - Signal
STAN COUNTY TRAFFIC6/30/2020 4,060.14 ML Expenditures June 20Traffic Signal Modification, Traffic Signal/ITS.
STAN COUNTY TRAFFIC6/30/2020 126,658.69 MEASURE L STANISLAUS COUNTY JULY 2020 REVENUE ACCRUALFY19/20 REVENUE ACCRUAL JULY REVENUE
STAN COUNTY TRAFFIC6/30/2020 85,140.36 MEASURE L STANISLAUS COUNTY JUNE 2020 REVENUEFY19/20 REVENUE
STAN COUNTY BIKE2/6/2018 350,598.30 COUNTY ML18-10, JUNE2017-JAN2018 PMT#1June 2017-Jan-2018
STAN COUNTY BIKE3/12/2018 48,564.49 MEASURE L STANISLAUS COUNTY ML18-22, FEBRUARY 2018 PMT #2Feb-18
STAN COUNTY BIKE3/12/2018 133,265.74 ADA Curb Ramp Improvements and Measure L Sidewalk Project
STAN COUNTY BIKE4/12/2018 4,995.31 2017 ADA Curb Ramp Project, Measure L Sidewalk Project
STAN COUNTY BIKE4/12/2018 4,995.31 2017 ADA Curb Ramp, Measure L Sidewalk
STAN COUNTY BIKE4/24/2018 60,648.71 MEASURE L STANISLAUS COUNTY ML18-32, MARCH 2018 PMT #3Mar-18
STAN COUNTY BIKE5/10/2018 4,864.51 StanCo, ADA Curb and Sidewalk Project
STAN COUNTY BIKE5/29/2018 35,019.74 MEASURE L STANISLAUS COUNTY ML18-43, APRIL 2018 PMT #4Apr-18
STAN COUNTY BIKE6/8/2018 203,228.69 StanCo - ADA Curb, Sidewalk Project
STAN COUNTY BIKE6/25/2018 58,568.91 MEASURE L STANISLAUS COUNTY ML18-53, MAY 2018 PAYMENT #5May-18
STAN COUNTY BIKE7/11/2018 102,270.44 ADA Curb, Sidewalk Project
STAN COUNTY BIKE7/24/2018 43,197.79 MEASURE L STANISLAUS COUNTY ML19-10, JUNE 2018 PMT #1Jun-18
STAN COUNTY BIKE8/10/2018 11,489.21 ADA Curb Ramp, Sidewalk Project
STAN COUNTY BIKE8/21/2018 46,949.37 MEASURE L STANISLAUS COUNTY ML19-21, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
STAN COUNTY BIKE9/11/2018 45,404.22 ADA Curb, Sidewalk Project
STAN COUNTY BIKE9/18/2018 42,259.35 MEASURE L STANISLAUS COUNTY ML19-32, AUGUST 2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
STAN COUNTY BIKE9/30/2018 122,593.96 2017 ADA CURB RAMP, MEASURE L SIDEWALK
STAN COUNTY BIKE10/24/2018 48,095.74 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L STANISLAUS COUNTY ML19-43, SEPTEMBER 2018 PMT #3
STAN COUNTY BIKE11/9/2018 18,895.97 Measure L Sidewalk and ADA
STAN COUNTY BIKE11/19/2018 63,793.51 MEASURE L STANISLAUS COUNTY ML19-54, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
STAN COUNTY BIKE12/11/2018 71,929.87 StanCounty Nov 2018 Expenditures2017 ADA Curb Ramp, Sidewalk Project
STAN COUNTY BIKE12/19/2018 51,750.98 MEASURE L STANISLAUS COUNTY ML19-65, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
STAN COUNTY BIKE1/14/2019 1,841.59 Measure L Sidewalk Project
STAN COUNTY BIKE1/24/2019 51,778.14 MEASURE L STANISLAUS COUNTY ML19-76, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
STAN COUNTY BIKE2/8/2019 245,188.71 2017 ADA Curb, Measure L Sidewalk
STAN COUNTY BIKE2/27/2019 51,942.84 MEASURE L STANISLAUS COUNTY ML19-87, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
STAN COUNTY BIKE3/8/2019 12,981.36 Empire Sidewalk, Measure L Sidewalk
STAN COUNTY BIKE3/19/2019 53,564.97 MEASURE L STANISLAUS COUNTY ML19-97, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
STAN COUNTY BIKE4/10/2019 34,467.52 2019 ADA Curb, Measure L Sidewalk
STAN COUNTY BIKE4/17/2019 49,728.02 MEASURE L STANISLAUS COUNTY ML19-107, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
STAN COUNTY BIKE5/8/2019 3,044.37 ADA Curb, Sidewalk Project
STAN COUNTY BIKE5/24/2019 51,300.11 MEASURE L STANISLAUS COUNTY ML19-118, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
STAN COUNTY BIKE5/31/2019 8,006.88 May 2019 Measure L Expenditures2019 ADA Curb Ramp, Measure L Sidewalk Project, County Wide Sidewalk Prioritization
STAN COUNTY BIKE5/31/2019 26,795.48 May 2019 Measure L ExpendituresMeasure L Sidewalk Project
STAN COUNTY BIKE6/20/2019 41,234.77 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
STAN COUNTY BIKE6/30/2019 9,507.98 June 2019 Measure L ExpendituresMeasure L Sidewalk Project, County Wide Sidewalk Prioritization.
STAN COUNTY BIKE7/23/2019 49,051.86 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11FY18/19 MEASURE L PAYMENT; JUNE 2019
STAN COUNTY BIKE8/28/2019 56,834.32 MEASURE L FY19-20 STANISLAUS COUNTY ML20-10, JULY 2019 PMT#1STANCOG MEASURE L PAYMENT; JUNE 2019
STAN COUNTY BIKE8/31/2019 12,676.61 August Measure L Expenditures
STAN COUNTY BIKE9/25/2019 49,266.69 MEASURE L FY19-20 STANISLAUS COUNTY ML20-21, AUG 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
STAN COUNTY BIKE11/4/2019 50,459.97 MEASURE L FY19-20 STAN COUNTY ML20-32, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
STAN COUNTY BIKE11/21/2019 60,484.16 MEASURE L FY19-20 STAN COUNTY ML20-43, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
STAN COUNTY BIKE11/30/2019 38,502.88 ML Expenditures November 20192019 ADA Curb Ramp, ML Sidewalk Project, County Wide Sidewalk Prioritization, Airport Ngbhd Active Transportation Connectivity& Safety, Breat Harte Elementary Safe Crossing and Active Transportation Connectivity, Robertson Road Elementary Safe Crossing...
STAN COUNTY BIKE12/17/2019 50,082.56 MEASURE L FY19-20 STAN COUNTY ML20-54, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
STAN COUNTY BIKE12/31/201957.00ML Expenditures December 192019 ADA Curb Ramp Project
STAN COUNTY BIKE1/29/2020 49,830.69 MEASURE L FY19-20 STAN COUNTY ML20-65, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
STAN COUNTY BIKE1/31/2020 13,253.25 January 20 Measure L Expenditures2019 ADA Curb Ramp, ML Sidewalk Project, County Wide Sidewalk Prioritization, Airport Ngbhd Active Transp. Connect.&Safety, Breat Harte Elementary Safe Crossing and Active Transport. Connect., Robertson Road Elementary Safe Crossing and Active Transport.
STAN COUNTY BIKE1/31/2020 5,478.35 January 20 Measure L ExpendituresML Sidewalk Project
STAN COUNTY BIKE2/24/2020 50,752.78 MEASURE L FY19-20 STAN COUNTY ML20-76, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
STAN COUNTY BIKE2/28/2020 (249,187.07)Measure L Expenditures - FY1819 Adjustment
STAN COUNTY BIKE2/29/2020 2,520.75 ML Expenditures February 20ML Sidewalk Proj.
STAN COUNTY BIKE2/29/2020 21,562.81 ML Expenditures February 20ML Sidewalk Project, County Wide Sidewalk Priorit., Airport Neighborh Active Transport.Connectivity & Safety,Breat Harte Element. Safe Crossing&Active Transport. Connect., Downtown DEnair Active Transp.Connect. &Safety, Turlock Area ML Sidewalk
STAN COUNTY BIKE3/12/2020 67,535.16 MEASURE L FY19-20 STAN COUNTY ML20-87, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
STAN COUNTY BIKE3/31/2020114.00ML Expenditures March 20ML Sidewalk project
STAN COUNTY BIKE4/28/2020 43,698.25 MEASURE L FY19-20 STAN COUNTY ML20-98, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020
STAN COUNTY BIKE4/30/2020 18,199.97 ML Expenditures April 20ML Sidewalk Project
STAN COUNTY BIKE5/28/2020 43,773.79 MEASURE L FY19-20 STAN COUNTY ML20-109, APRIL 2020 PMT #10STANCOG MEASURE L PAYMENT; APRIL 2020
STAN COUNTY BIKE5/31/2020 6,405.28 ML Expenditures May 20Empire ML Sidewalk proj., County Wide Sidewalk proj, Airport Ngbhd Transportation Connectivity, Breat Harte Element Safe Crossing and Act Transport connectivity, Robertson Rd Element Safe Crossing, Downtown Denair Active Transp Connect, Turlock sidewalk
STAN COUNTY BIKE5/31/2020 31,891.47 ML Expenditures May 20MLSidewalk proj., Countywide sidewalk project
STAN COUNTY BIKE6/23/2020 39,113.99 MEASURE L FY19-20 STAN COUNTY ML20-120, MAY 2020 PMT #11STANCOG MEASURE L PAYMENT; MAY 2020
STAN COUNTY BIKE6/30/2020 16,727.83 ML Expenditures June 202019 ADA Curb Ramp, ML Sidewalk, Count/Wide Sidewalk.
STAN COUNTY BIKE6/30/2020 59,471.02 ML Expenditures June 202019 ADA Curb Ramp, ML Sidewalk, Count/Wide Sidewalk, Airp Ngbhd Active Transp. Conn@Safety, Bret Harte Elem Safe Crossing, Robertson Rd Elem. Safe Crossing, Downtown Denair Act Transp Connect, Turlock MLSidewalk
STAN COUNTY BIKE6/30/2020 609,213.47 ML Expenditures June 202019 ADA Curb Ramp.
STAN COUNTY BIKE6/30/2020 63,329.34 MEASURE L STANISLAUS COUNTY JULY 2020 REVENUE ACCRUALFY19/20 REVENUE ACCRUAL JULY REVENUE
STAN COUNTY BIKE6/30/2020 42,570.18 MEASURE L STANISLAUS COUNTY JUNE 2020 REVENUEFY19/20 REVENUE