Local Benefits:

Road Reconstruction/Repair Projects
PriorityLocationFrom
Notes
1Summers StF St to D StCompleted in 2018
2Church StreetYosemite to KadotaCompleted in 2018
3H StreetYosemite to DorseyIn Design 2019 Construction 2020/21
4I StreetBentley to MainIn Design 2019 Construction 2020/21
5Main StreetG to ChurchIn Design 2019 Construction 2020/21
6G StreetYosemite to ChurchIn Design 2019 Construction 2020/21
7D StreetBentley to Main
8E StreetLa Gallina to Oden
9B StreetBentley to Dorsey
10Welch StLoy, Barnes, Tohara
11Harriett DriveBentley to Enid
12Kadota AvenuePasadena to Western
13Hickman StreetBaker to N.Appling

Click here for a list of Revenues and Expenditures


ExpeditureEffective DateRevenueExpenseCash BalanceTransaction DescriptionDocument Description
WATERFORD STREETS2/22/2018 163,733.81 WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1
WATERFORD STREETS3/12/2018 22,680.23 MEASURE L WATERFORD ML18-21, FEBRUARY 2018 PMT #2MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD STREETS4/24/2018 28,323.71 MEASURE L WATERFORD ML18-31, MARCH 2018 PMT #3MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
WATERFORD STREETS5/29/2018 14,370.00 Waterford Expenses to 5-29-2018Summers Street Reconstruction Engineering
WATERFORD STREETS5/29/2018 16,354.66 MEASURE L WATERFORD ML18-42, APRIL 2018 PMT #4MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
WATERFORD STREETS6/25/2018 27,352.42 MEASURE L WATERFORD ML18-52, MAY 2018 PAYMENT #5FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD STREETS6/30/2018 3,745.00 Waterford Expenses 5-30 to 6-30-2018 Summer Street
WATERFORD STREETS7/24/2018 20,173.91 MEASURE L WATERFORD ML19-09, JUNE 2018 PMT #1FY18-19 MEAURE L JUNE 2018, PAYMENT #1
WATERFORD STREETS8/21/2018 21,925.95 MEASURE L WATERFORD ML19-20, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
WATERFORD STREETS8/31/2018 185,214.48 Waterford August 2018 Expenditures - Summer Street Reconst.
WATERFORD STREETS9/18/2018 19,735.65 MEASURE L WATERFORD ML19-31, AUGUST 2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
WATERFORD STREETS10/24/2018 22,461.32 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L WATERFORD ML19-42, SEPTEMBER 2018 PMT #3
WATERFORD STREETS10/30/2018 30,587.33 Waterford September 2018 ExpensesSummer Street Reconstruction
WATERFORD STREETS11/19/2018 29,792.37 MEASURE L WATERFORD ML19-53, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
WATERFORD STREETS11/30/2018 4,165.00 Waterford November 2018 ExpensesSummer Street Project
WATERFORD STREETS12/4/2018 96,423.19 Waterford October 2018 ExpensesSummer Street Project
WATERFORD STREETS12/19/2018 24,168.36 MEASURE L WATERFORD ML19-64, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
WATERFORD STREETS1/24/2019 24,181.05 MEASURE L WATERFORD ML19-75, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
WATERFORD STREETS1/31/2019 62,760.13 Waterford Jan 2019 ExpendituresSummer Street
WATERFORD STREETS2/27/2019 24,257.96 MEASURE L WATERFORD ML19-86, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
WATERFORD STREETS2/28/2019 22,228.78 Waterford Feb 2019 ExpendituresSummer Street Construction
WATERFORD STREETS3/19/2019 25,015.52 MEASURE L WATERFORD ML19-96, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
WATERFORD STREETS3/31/2019705.00Waterford March 2019 ExpendituresSummer Street Engineering
WATERFORD STREETS4/17/2019 23,223.61 MEASURE L WATERFORD ML19-106, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
WATERFORD STREETS5/24/2019 23,957.80 MEASURE L WATERFORD ML19-117, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
WATERFORD STREETS6/20/2019 19,257.16 MEASURE L WATERFORD ML19-127, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
WATERFORD STREETS6/30/2019 123,538.89 Waterford June 2019 Expenditures - Church Street Reconstruct
WATERFORD STREETS6/30/2019 4,717.50 Waterford June 2019 Expenditures - Main Street G, H, & I
WATERFORD STREETS6/30/2019 6,095.00 Correct June Posting
WATERFORD STREETS7/23/2019 22,907.84 MEASURE L WATERFORD ML19-137, JUNE 2019 PMT #12FY18/19 MEASURE L PAYMENT; JUNE 2019
WATERFORD STREETS8/28/2019 26,542.34 MEASURE L FY19-20 WATERFORD ML20-09, JULY 2019 PMT #1STANCOG MEASURE L PAYMENT; JUNE 2019
WATERFORD STREETS9/25/2019 23,008.17 MEASURE L FY19-20 WATERFORD ML20-20, AUGUST 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
WATERFORD STREETS11/4/2019 23,565.44 MEASURE L FY19-20 WATERFORD ML20-31, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
WATERFORD STREETS11/21/2019 28,246.87 MEASURE L FY19-20 WATERFORD ML20-42, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
WATERFORD STREETS12/17/2019 23,389.19 MEASURE L FY19-20 WATERFORD ML20-53, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
WATERFORD STREETS12/31/2019 4,605.00 Main Street G, H, and IMain G H and I Engineering Costs
WATERFORD STREETS1/29/2020 23,271.56 MEASURE L FY19-20 WATERFORD ML20-64, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
WATERFORD STREETS2/24/2020 23,702.19 MEASURE L FY19-20 WATERFORD ML20-75, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
WATERFORD STREETS3/12/2020 31,539.77 MEASURE L FY19-20 WATERFORD ML20-86, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
WATERFORD STREETS4/28/2020 20,407.64 MEASURE L FY19-20 WATERFORD ML20-97, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020
WATERFORD TRAFFIC2/22/2018 32,746.76 WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1
WATERFORD TRAFFIC3/12/2018 4,536.05 MEASURE L WATERFORD ML18-21, FEBRUARY 2018 PMT #2MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD TRAFFIC4/24/2018 5,664.74 MEASURE L WATERFORD ML18-31, MARCH 2018 PMT #3MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
WATERFORD TRAFFIC5/29/2018 3,270.93 MEASURE L WATERFORD ML18-42, APRIL 2018 PMT #4MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
WATERFORD TRAFFIC6/25/2018 5,470.48 MEASURE L WATERFORD ML18-52, MAY 2018 PAYMENT #5FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD TRAFFIC7/24/2018 4,034.78 MEASURE L WATERFORD ML19-09, JUNE 2018 PMT #1FY18-19 MEAURE L JUNE 2018, PAYMENT #1
WATERFORD TRAFFIC8/21/2018 4,385.19 MEASURE L WATERFORD ML19-20, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
WATERFORD TRAFFIC9/18/2018 3,947.13 MEASURE L WATERFORD ML19-31, AUGUST 2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
WATERFORD TRAFFIC10/24/2018 4,492.26 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L WATERFORD ML19-42, SEPTEMBER 2018 PMT #3
WATERFORD TRAFFIC11/19/2018 5,958.47 MEASURE L WATERFORD ML19-53, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
WATERFORD TRAFFIC12/19/2018 4,833.67 MEASURE L WATERFORD ML19-64, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
WATERFORD TRAFFIC1/24/2019 4,836.21 MEASURE L WATERFORD ML19-75, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
WATERFORD TRAFFIC2/27/2019 4,851.59 MEASURE L WATERFORD ML19-86, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
WATERFORD TRAFFIC3/19/2019 5,003.10 MEASURE L WATERFORD ML19-96, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
WATERFORD TRAFFIC4/17/2019 4,644.72 MEASURE L WATERFORD ML19-106, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
WATERFORD TRAFFIC5/24/2019 4,791.56 MEASURE L WATERFORD ML19-117, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
WATERFORD TRAFFIC6/20/2019 3,851.43 MEASURE L WATERFORD ML19-127, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
WATERFORD TRAFFIC7/23/2019 4,581.57 MEASURE L WATERFORD ML19-137, JUNE 2019 PMT #12FY18/19 MEASURE L PAYMENT; JUNE 2019
WATERFORD TRAFFIC8/28/2019 5,308.47 MEASURE L FY19-20 WATERFORD ML20-09, JULY 2019 PMT #1STANCOG MEASURE L PAYMENT; JUNE 2019
WATERFORD TRAFFIC9/25/2019 4,601.63 MEASURE L FY19-20 WATERFORD ML20-20, AUGUST 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
WATERFORD TRAFFIC11/4/2019 4,713.09 MEASURE L FY19-20 WATERFORD ML20-31, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
WATERFORD TRAFFIC11/21/2019 5,649.37 MEASURE L FY19-20 WATERFORD ML20-42, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
WATERFORD TRAFFIC12/17/2019 4,677.84 MEASURE L FY19-20 WATERFORD ML20-53, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
WATERFORD TRAFFIC1/29/2020 4,654.31 MEASURE L FY19-20 WATERFORD ML20-64, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
WATERFORD TRAFFIC2/24/2020 4,740.44 MEASURE L FY19-20 WATERFORD ML20-75, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
WATERFORD TRAFFIC3/12/2020 6,307.95 MEASURE L FY19-20 WATERFORD ML20-86, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
WATERFORD TRAFFIC4/28/2020 4,081.53 MEASURE L FY19-20 WATERFORD ML20-97, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020
WATERFORD BIKE2/22/2018 16,373.38 WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1WATERFORD ML18-12, JUNE17-JAN2018 PAYMENT#1
WATERFORD BIKE3/12/2018 2,268.02 MEASURE L WATERFORD ML18-21, FEBRUARY 2018 PMT #2MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD BIKE4/24/2018 2,832.37 MEASURE L WATERFORD ML18-31, MARCH 2018 PMT #3MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
WATERFORD BIKE5/29/2018 1,635.47 MEASURE L WATERFORD ML18-42, APRIL 2018 PMT #4MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
WATERFORD BIKE6/25/2018 2,735.24 MEASURE L WATERFORD ML18-52, MAY 2018 PAYMENT #5FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
WATERFORD BIKE7/24/2018 2,017.39 MEASURE L WATERFORD ML19-09, JUNE 2018 PMT #1FY18-19 MEAURE L JUNE 2018, PAYMENT #1
WATERFORD BIKE8/21/2018 2,192.59 MEASURE L WATERFORD ML19-20, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
WATERFORD BIKE9/18/2018 1,973.56 MEASURE L WATERFORD ML19-31, AUGUST 2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
WATERFORD BIKE10/24/2018 2,246.13 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L WATERFORD ML19-42, SEPTEMBER 2018 PMT #3
WATERFORD BIKE11/19/2018 2,979.24 MEASURE L WATERFORD ML19-53, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
WATERFORD BIKE12/19/2018 2,416.84 MEASURE L WATERFORD ML19-64, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
WATERFORD BIKE1/24/2019 2,418.10 MEASURE L WATERFORD ML19-75, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
WATERFORD BIKE1/31/2019 57,055.75 Waterford Jan 2019 ExpendituresSummer Street
WATERFORD BIKE2/27/2019 2,425.80 MEASURE L WATERFORD ML19-86, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
WATERFORD BIKE3/19/2019 2,501.55 MEASURE L WATERFORD ML19-96, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
WATERFORD BIKE4/17/2019 2,322.36 MEASURE L WATERFORD ML19-106, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
WATERFORD BIKE5/24/2019 2,395.78 MEASURE L WATERFORD ML19-117, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
WATERFORD BIKE6/20/2019 1,925.72 MEASURE L WATERFORD ML19-127, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
WATERFORD BIKE6/30/2019 (6,095.00)Correct June Posting
WATERFORD BIKE7/23/2019 2,290.78 MEASURE L WATERFORD ML19-137, JUNE 2019 PMT #12FY18/19 MEASURE L PAYMENT; JUNE 2019
WATERFORD BIKE8/28/2019 2,654.23 MEASURE L FY19-20 WATERFORD ML20-09, JULY 2019 PMT #1STANCOG MEASURE L PAYMENT; JUNE 2019
WATERFORD BIKE9/25/2019 2,300.82 MEASURE L FY19-20 WATERFORD ML20-20, AUGUST 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
WATERFORD BIKE11/4/2019 2,356.54 MEASURE L FY19-20 WATERFORD ML20-31, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
WATERFORD BIKE11/21/2019 2,824.69 MEASURE L FY19-20 WATERFORD ML20-42, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
WATERFORD BIKE12/17/2019 2,338.92 MEASURE L FY19-20 WATERFORD ML20-53, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
WATERFORD BIKE1/29/2020 2,327.16 MEASURE L FY19-20 WATERFORD ML20-64, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
WATERFORD BIKE2/24/2020 2,370.22 MEASURE L FY19-20 WATERFORD ML20-75, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
WATERFORD BIKE3/12/2020 3,153.98 MEASURE L FY19-20 WATERFORD ML20-86, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
WATERFORD BIKE4/28/2020 2,040.76 MEASURE L FY19-20 WATERFORD ML20-97, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020

Allocations by expenditure categories: