Updated on: June 4, 2020 at 12:05 pm

Click on the logo to visit Stanislaus County’s page

Contact

David Leamon
Public Works Director
Stanislaus County
1716 Morgan Road
Modesto, CA 95358
(209) 525-4302
email

County Benefits:

The County will be able to resurface EVERY road in the unincorporated area of the County three times over the course of the life of the measure.

  • ​3,085 Miles of Chip Seal
  • 845 Miles of Slurry Seal
  • 325 Miles of Overlay
  • 50 miles of Reconstructed Roads.​

Click here for a list of Revenues and Expenditures


County of Stanislaus        
07/01/2017-Current
ExpenditureEffective DateRevenueExpenseCash BalanceTransaction DescriptionDocument Description
STAN COUNTY STREETS2/6/2018 3,505,982.95 COUNTY ML18-10, JUNE2017-JAN2018 PMT#1COUNTY ML18-10, JUNE2017-JAN2018 PMT#1
STAN COUNTY STREETS3/12/2018 4,174,854.62 2017 Chip Seal, 2017 Salida Pavement Pres., 2018 Pavement
STAN COUNTY STREETS3/12/2018 485,644.86 MEASURE L STANISLAUS COUNTY ML18-22, FEBRUARY 2018 PMT #2MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY STREETS4/12/2018 32,782.99 2018 Chip Seal, 2018 Pavement Preservation, Roadway Reconstr
STAN COUNTY STREETS4/24/2018 606,487.14 MEASURE L STANISLAUS COUNTY ML18-32, MARCH 2018 PMT #3MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY STREETS5/10/2018 51,352.20 StanCo, 2018 Chip Seal, Salida Pavement, 2018 Pavement Pres.
STAN COUNTY STREETS5/29/2018 350,197.43 MEASURE L STANISLAUS COUNTY ML18-43, APRIL 2018 PMT #4MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY STREETS6/8/2018 892,041.50 StanCO - 2017/2018 Chip, Salida Pavement, 2018 Pavement Pres
STAN COUNTY STREETS6/25/2018 585,689.09 MEASURE L STANISLAUS COUNTY ML18-53, MAY 2018 PAYMENT #5FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY STREETS7/11/2018 956,472.74 Chip Seal, Pavement Preservation, Reservoir Rd, Urban Pvmt
STAN COUNTY STREETS7/24/2018 431,977.87 MEASURE L STANISLAUS COUNTY ML19-10, JUNE 2018 PMT #1FY18-19 MEAURE L JUNE 2018, PAYMENT #1
STAN COUNTY STREETS8/10/2018 565,162.38 Chip Seal, Pavement Preservation, Urban Preservation,Ladd @ St Johns
STAN COUNTY STREETS8/21/2018 469,493.68 MEASURE L STANISLAUS COUNTY ML19-21, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
STAN COUNTY STREETS9/11/2018 1,615,213.13 2018 Chip, 2018 PP, Diablo Grande, Urban Pvmnt, Ladd@St John
STAN COUNTY STREETS9/18/2018 422,593.46 MEASURE L STANISLAUS COUNTY ML19-32, AUGUST 2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
STAN COUNTY STREETS9/30/2018 1,048,086.77 CHIP SEAL, PAVEMENT PRESERVATION, LADD @ ST JOHNS, MITCHELL& QUINCY ROADS
STAN COUNTY STREETS10/24/2018 480,957.37 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L STANISLAUS COUNTY ML19-43, SEPTEMBER 2018 PMT #3
STAN COUNTY STREETS11/9/2018 32,986.39 Chip Seal and Urban Preservation
STAN COUNTY STREETS11/19/2018 637,935.08 MEASURE L STANISLAUS COUNTY ML19-54, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
STAN COUNTY STREETS12/11/2018 81,424.89 StanCounty Nov 2018 Expenditures2018 Pavement Preservation, Diable Grande Parkway, Urban Pavement Preservation, Ladd @ St Johns
STAN COUNTY STREETS12/19/2018 517,509.84 MEASURE L STANISLAUS COUNTY ML19-65, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
STAN COUNTY STREETS1/14/2019 41,357.35 2018 and 2019 Pavement Preservation and Ladd @ St Johns
STAN COUNTY STREETS1/24/2019 517,781.43 MEASURE L STANISLAUS COUNTY ML19-76, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
STAN COUNTY STREETS2/8/2019 446,463.69 2019 Chip, 2018 Urban PP, 2019 Urban PP, Mitchell and Quincy
STAN COUNTY STREETS2/27/2019 519,428.39 MEASURE L STANISLAUS COUNTY ML19-87, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
STAN COUNTY STREETS3/8/2019 208,038.37 2019 Chip, 2018/2019/2020 Urban PP, Ladd @ St Johns
STAN COUNTY STREETS3/19/2019 535,649.72 MEASURE L STANISLAUS COUNTY ML19-97, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
STAN COUNTY STREETS4/10/2019 171,343.24 2019 Chip, 2020 Urban, 2018 Urban, 2019 Urban, St Johns @Ladd, Mitchall and Quincy Roads
STAN COUNTY STREETS4/10/2019 12,151.88 2019 Chip, 2020 Urban, 2018 Urban, 2019 Urban, St Johns @Ladd, Mitchell and Quincy Roads
STAN COUNTY STREETS4/17/2019 497,280.17 MEASURE L STANISLAUS COUNTY ML19-107, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
STAN COUNTY STREETS5/8/2019 14,414.75 2019 Chip, Urban Pavement
STAN COUNTY STREETS5/8/2019 256,008.43 2019 Chip, Urban Pavement Preservation
STAN COUNTY STREETS5/24/2019 513,001.14 MEASURE L STANISLAUS COUNTY ML19-118, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
STAN COUNTY STREETS5/31/2019 12,445.04 May 2019 Measure L Expenditures
STAN COUNTY STREETS5/31/2019 11,236.00 May 2019 Measure L Expenditures2018 Urban Pavement Preservation, 2019 Urban Pavement Preservation
STAN COUNTY STREETS6/20/2019 412,347.69 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
STAN COUNTY STREETS6/30/2019 8,094.50 June 2019 Measure L Expenditures
STAN COUNTY STREETS6/30/2019 10,674.37 June 2019 Measure L Expenditures2019 Chip Seal, 2020 Urban Pavement Preservation, 2018 Urban Pavement Preservation, Diablo Grande Parkway Resurfacing, 2019 Urban Pavement Preservation, Ladd @ St Johns.
STAN COUNTY STREETS6/30/2019650.00June 2019 Measure L ExpendituresLadd @ St Johns.
STAN COUNTY STREETS7/23/2019 490,518.58 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11FY18/19 MEASURE L PAYMENT; JUNE 2019
STAN COUNTY STREETS8/28/2019 568,343.17 MEASURE L FY19-20 STANISLAUS COUNTY ML20-10, JULY 2019 PMT#1STANCOG MEASURE L PAYMENT; JUNE 2019
STAN COUNTY STREETS9/25/2019 492,666.91 MEASURE L FY19-20 STANISLAUS COUNTY ML20-21, AUG 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
STAN COUNTY STREETS9/30/2019 1,469.00 September 19 Measure L Expenditures2018 Urban Pavement Preservation, Ladd @ St Johns.
STAN COUNTY STREETS9/30/2019 376,337.77 September 19 Measure L Expenditures2019 Chip Seal, 2018 Urban Pavement Preservation.
STAN COUNTY STREETS10/31/2019 776,588.37 October 19 Measure L Expenditures2019 Chip Seal and 2018 Urban Pavement Preservation projects, multiple locations
STAN COUNTY STREETS11/4/2019 504,599.74 MEASURE L FY19-20 STAN COUNTY ML20-32, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
STAN COUNTY STREETS11/21/2019 604,841.63 MEASURE L FY19-20 STAN COUNTY ML20-43, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
STAN COUNTY STREETS11/30/2019 88,816.40 ML Expenditures November 20192019 Chip Seal Project
STAN COUNTY STREETS11/30/2019 26,692.58 ML Expenditures November 20192019 Chip Seal, 2020 Urban Pavement Preservation, 2018 Urban Pavement Preservation, Diablo Grande Parkway Resurfacing projects
STAN COUNTY STREETS12/17/2019 500,825.63 MEASURE L FY19-20 STAN COUNTY ML20-54, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
STAN COUNTY STREETS12/31/2019 16,452.27 ML Expenditures December 192019 Chip Seal Project
STAN COUNTY STREETS1/29/2020 498,306.90 MEASURE L FY19-20 STAN COUNTY ML20-65, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
STAN COUNTY STREETS1/31/2020 5,061.97 January 20 Measure L Expenditures2018 Urban Pavement Preservation, Ladd @ St Johns
STAN COUNTY STREETS3/12/2020 675,351.59 MEASURE L FY19-20 STAN COUNTY ML20-87, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
STAN COUNTY STREETS4/28/2020 436,982.54 MEASURE L FY19-20 STAN COUNTY ML20-98, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020
STAN COUNTY STREETS2/28/2020 1,481,286.78 Measure L Expenditures - FY1819 Adjustment
STAN COUNTY STREETS2/29/2020 43,946.08 ML Expenditures February 202018,2019 & 2020 Urban Preserv.,Ladd St & St Johns,Mitchell &Quincy Rd, 2019 & 2020 Chip Seal Proj., 2019 ADA Curb Ramp Proj.
STAN COUNTY STREETS2/29/2020 409,209.37 ML Expenditures February 202019 Chip Seal Project
STAN COUNTY STREETS2/29/2020 1,020,422.06 ML Expenditures February 202019 Chip Seal Project, 2019 ADACurb Ramp Proj.
STAN COUNTY STREETS3/31/2020 2,386.16 ML Expenditures March 202019 Urban Pavem Preservation, Ladd & St Johns, 2019 ADA Curb Ramp project
STAN COUNTY STREETS1/31/2020 13,198.46 January 20 Measure L Expenditures2019 Chip Seal, 2020 Urban Pavement Preservation, 2018 Urban Pavement Preservation, Diablo Grande Parkway Resurfacing, 2019 Urban Pavement Preservation
STAN COUNTY STREETS1/31/2020 1,165,190.25 January 20 Measure L ExpendituresRoads Ops - Force Account FY1920: Arnold Avenue, Euclid Avenue, Mitchell Road, Powell Road, Tim Bell Road and Zeering Road.
STAN COUNTY STREETS2/24/2020 507,527.84 MEASURE L FY19-20 STAN COUNTY ML20-76, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
STREETS Total 16,769,921.84 16,070,312.75 699,609.09
STAN COUNTY TRAFFIC2/6/2018 701,196.60 COUNTY ML18-10, JUNE2017-JAN2018 PMT#1COUNTY ML18-10, JUNE2017-JAN2018 PMT#1
STAN COUNTY TRAFFIC3/12/2018 97,128.97 MEASURE L STANISLAUS COUNTY ML18-22, FEBRUARY 2018 PMT #2MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY TRAFFIC4/24/2018 121,297.43 MEASURE L STANISLAUS COUNTY ML18-32, MARCH 2018 PMT #3MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY TRAFFIC5/29/2018 70,039.49 MEASURE L STANISLAUS COUNTY ML18-43, APRIL 2018 PMT #4MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY TRAFFIC6/25/2018 117,137.82 MEASURE L STANISLAUS COUNTY ML18-53, MAY 2018 PAYMENT #5FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
STAN COUNTY TRAFFIC7/24/2018 86,395.57 MEASURE L STANISLAUS COUNTY ML19-10, JUNE 2018 PMT #1FY18-19 MEAURE L JUNE 2018, PAYMENT #1
STAN COUNTY TRAFFIC8/21/2018 93,898.74 MEASURE L STANISLAUS COUNTY ML19-21, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
STAN COUNTY TRAFFIC9/18/2018 84,518.69 MEASURE L STANISLAUS COUNTY ML19-32, AUGUST 2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
STAN COUNTY TRAFFIC10/24/2018 96,191.47 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L STANISLAUS COUNTY ML19-43, SEPTEMBER 2018 PMT #3
STAN COUNTY TRAFFIC11/19/2018 127,587.02 MEASURE L STANISLAUS COUNTY ML19-54, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
STAN COUNTY TRAFFIC12/19/2018 103,501.97 MEASURE L STANISLAUS COUNTY ML19-65, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
STAN COUNTY TRAFFIC1/24/2019 103,556.29 MEASURE L STANISLAUS COUNTY ML19-76, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
STAN COUNTY TRAFFIC2/27/2019 103,885.68 MEASURE L STANISLAUS COUNTY ML19-87, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
STAN COUNTY TRAFFIC3/19/2019 107,129.94 MEASURE L STANISLAUS COUNTY ML19-97, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
STAN COUNTY TRAFFIC4/10/2019600.72Traffic Signal Modification, Traffic Signal/ITS
STAN COUNTY TRAFFIC4/17/2019 99,456.03 MEASURE L STANISLAUS COUNTY ML19-107, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
STAN COUNTY TRAFFIC5/24/2019 102,600.23 MEASURE L STANISLAUS COUNTY ML19-118, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
STAN COUNTY TRAFFIC5/31/2019650.78May 2019 Measure L ExpendituresTraffic Signal Modification, Traffic Signal/ITS
STAN COUNTY TRAFFIC6/20/2019 82,469.54 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
STAN COUNTY TRAFFIC6/30/2019 1,200,000.00 Expenditures Adjustment June 2019
STAN COUNTY TRAFFIC6/30/2019 11,713.17 June 2019 Measure L ExpendituresTraffic Signal/ITS
STAN COUNTY TRAFFIC7/23/2019 98,103.72 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11FY18/19 MEASURE L PAYMENT; JUNE 2019
STAN COUNTY TRAFFIC8/28/2019 113,668.63 MEASURE L FY19-20 STANISLAUS COUNTY ML20-10, JULY 2019 PMT#1STANCOG MEASURE L PAYMENT; JUNE 2019
STAN COUNTY TRAFFIC8/31/2019 19,002.28 August Measure L Expenditures
STAN COUNTY TRAFFIC9/25/2019 98,533.38 MEASURE L FY19-20 STANISLAUS COUNTY ML20-21, AUG 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
STAN COUNTY TRAFFIC10/31/2019 1,181.23 October 19 Measure L ExpendituresLadd @ St Johns
STAN COUNTY TRAFFIC11/4/2019 100,919.95 MEASURE L FY19-20 STAN COUNTY ML20-32, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
STAN COUNTY TRAFFIC11/21/2019 120,968.33 MEASURE L FY19-20 STAN COUNTY ML20-43, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
STAN COUNTY TRAFFIC11/30/2019 2,693.20 ML Expenditures November 2019Traffic Signal/ITS
STAN COUNTY TRAFFIC12/17/2019 100,165.13 MEASURE L FY19-20 STAN COUNTY ML20-54, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
STAN COUNTY TRAFFIC1/29/2020 99,661.38 MEASURE L FY19-20 STAN COUNTY ML20-65, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
STAN COUNTY TRAFFIC1/31/2020515.64January 20 Measure L ExpendituresTraffic Signal/ITS
STAN COUNTY TRAFFIC2/28/2020 (11,713.17)Measure L Expenditures - FY1819 Adjustment
STAN COUNTY TRAFFIC2/29/2020 1,910.63 ML Expenditures February 20Traffic Signal/ ITC
STAN COUNTY TRAFFIC3/12/2020 135,070.32 MEASURE L FY19-20 STAN COUNTY ML20-87, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
STAN COUNTY TRAFFIC4/28/2020 87,396.51 MEASURE L FY19-20 STAN COUNTY ML20-98, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020
STAN COUNTY TRAFFIC2/24/2020 101,505.57 MEASURE L FY19-20 STAN COUNTY ML20-76, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
TRAFFIC Total 3,353,984.40 1,226,554.48 2,127,429.92
STAN COUNTY BIKE2/6/2018 350,598.30 COUNTY ML18-10, JUNE2017-JAN2018 PMT#1June 2017-Jan-2018
STAN COUNTY BIKE3/12/2018 48,564.49 MEASURE L STANISLAUS COUNTY ML18-22, FEBRUARY 2018 PMT #2Feb-18
STAN COUNTY BIKE3/12/2018 133,265.74 ADA Curb Ramp Improvements and Measure L Sidewalk Project
STAN COUNTY BIKE4/12/2018 4,995.31 2017 ADA Curb Ramp Project, Measure L Sidewalk Project
STAN COUNTY BIKE4/12/2018 4,995.31 2017 ADA Curb Ramp, Measure L Sidewalk
STAN COUNTY BIKE4/24/2018 60,648.71 MEASURE L STANISLAUS COUNTY ML18-32, MARCH 2018 PMT #3Mar-18
STAN COUNTY BIKE5/10/2018 4,864.51 StanCo, ADA Curb and Sidewalk Project
STAN COUNTY BIKE5/29/2018 35,019.74 MEASURE L STANISLAUS COUNTY ML18-43, APRIL 2018 PMT #4Apr-18
STAN COUNTY BIKE6/8/2018 203,228.69 StanCo - ADA Curb, Sidewalk Project
STAN COUNTY BIKE6/25/2018 58,568.91 MEASURE L STANISLAUS COUNTY ML18-53, MAY 2018 PAYMENT #5May-18
STAN COUNTY BIKE7/11/2018 102,270.44 ADA Curb, Sidewalk Project
STAN COUNTY BIKE7/24/2018 43,197.79 MEASURE L STANISLAUS COUNTY ML19-10, JUNE 2018 PMT #1Jun-18
STAN COUNTY BIKE8/10/2018 11,489.21 ADA Curb Ramp, Sidewalk Project
STAN COUNTY BIKE8/21/2018 46,949.37 MEASURE L STANISLAUS COUNTY ML19-21, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
STAN COUNTY BIKE9/11/2018 45,404.22 ADA Curb, Sidewalk Project
STAN COUNTY BIKE9/18/2018 42,259.35 MEASURE L STANISLAUS COUNTY ML19-32, AUGUST 2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
STAN COUNTY BIKE9/30/2018 122,593.96 2017 ADA CURB RAMP, MEASURE L SIDEWALK
STAN COUNTY BIKE10/24/2018 48,095.74 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L STANISLAUS COUNTY ML19-43, SEPTEMBER 2018 PMT #3
STAN COUNTY BIKE11/9/2018 18,895.97 Measure L Sidewalk and ADA
STAN COUNTY BIKE11/19/2018 63,793.51 MEASURE L STANISLAUS COUNTY ML19-54, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
STAN COUNTY BIKE12/11/2018 71,929.87 StanCounty Nov 2018 Expenditures2017 ADA Curb Ramp, Sidewalk Project
STAN COUNTY BIKE12/19/2018 51,750.98 MEASURE L STANISLAUS COUNTY ML19-65, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
STAN COUNTY BIKE1/14/2019 1,841.59 Measure L Sidewalk Project
STAN COUNTY BIKE1/24/2019 51,778.14 MEASURE L STANISLAUS COUNTY ML19-76, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
STAN COUNTY BIKE2/8/2019 245,188.71 2017 ADA Curb, Measure L Sidewalk
STAN COUNTY BIKE2/27/2019 51,942.84 MEASURE L STANISLAUS COUNTY ML19-87, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
STAN COUNTY BIKE3/8/2019 12,981.36 Empire Sidewalk, Measure L Sidewalk
STAN COUNTY BIKE3/19/2019 53,564.97 MEASURE L STANISLAUS COUNTY ML19-97, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
STAN COUNTY BIKE4/10/2019 34,467.52 2019 ADA Curb, Measure L Sidewalk
STAN COUNTY BIKE4/17/2019 49,728.02 MEASURE L STANISLAUS COUNTY ML19-107, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
STAN COUNTY BIKE5/8/2019 3,044.37 ADA Curb, Sidewalk Project
STAN COUNTY BIKE5/24/2019 51,300.11 MEASURE L STANISLAUS COUNTY ML19-118, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
STAN COUNTY BIKE5/31/2019 8,006.88 May 2019 Measure L Expenditures2019 ADA Curb Ramp, Measure L Sidewalk Project, County Wide Sidewalk Prioritization
STAN COUNTY BIKE5/31/2019 26,795.48 May 2019 Measure L ExpendituresMeasure L Sidewalk Project
STAN COUNTY BIKE6/20/2019 41,234.77 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
STAN COUNTY BIKE6/30/2019 9,507.98 June 2019 Measure L ExpendituresMeasure L Sidewalk Project, County Wide Sidewalk Prioritization.
STAN COUNTY BIKE7/23/2019 49,051.86 MEASURE L STANISLAUS COUNTY ML19-128, MAY 2019 PMT #11FY18/19 MEASURE L PAYMENT; JUNE 2019
STAN COUNTY BIKE8/28/2019 56,834.32 MEASURE L FY19-20 STANISLAUS COUNTY ML20-10, JULY 2019 PMT#1STANCOG MEASURE L PAYMENT; JUNE 2019
STAN COUNTY BIKE8/31/2019 12,676.61 August Measure L Expenditures
STAN COUNTY BIKE9/25/2019 49,266.69 MEASURE L FY19-20 STANISLAUS COUNTY ML20-21, AUG 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
STAN COUNTY BIKE11/4/2019 50,459.97 MEASURE L FY19-20 STAN COUNTY ML20-32, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
STAN COUNTY BIKE11/21/2019 60,484.16 MEASURE L FY19-20 STAN COUNTY ML20-43, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
STAN COUNTY BIKE11/30/2019 38,502.88 ML Expenditures November 20192019 ADA Curb Ramp, ML Sidewalk Project, County Wide Sidewalk Prioritization, Airport Ngbhd Active Transportation Connectivity& Safety, Breat Harte Elementary Safe Crossing and Active Transportation Connectivity, Robertson Road Elementary Safe Crossing...
STAN COUNTY BIKE12/17/2019 50,082.56 MEASURE L FY19-20 STAN COUNTY ML20-54, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
STAN COUNTY BIKE12/31/201957.00ML Expenditures December 192019 ADA Curb Ramp Project
STAN COUNTY BIKE1/29/2020 49,830.69 MEASURE L FY19-20 STAN COUNTY ML20-65, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
STAN COUNTY BIKE1/31/2020 13,253.25 January 20 Measure L Expenditures2019 ADA Curb Ramp, ML Sidewalk Project, County Wide Sidewalk Prioritization, Airport Ngbhd Active Transp. Connect.&Safety, Breat Harte Elementary Safe Crossing and Active Transport. Connect., Robertson Road Elementary Safe Crossing and Active Transport.
STAN COUNTY BIKE1/31/2020 5,478.35 January 20 Measure L ExpendituresML Sidewalk Project
STAN COUNTY BIKE2/24/2020 50,752.78 MEASURE L FY19-20 STAN COUNTY ML20-76, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
STAN COUNTY BIKE2/28/2020 (249,187.07)Measure L Expenditures - FY1819 Adjustment
STAN COUNTY BIKE2/29/2020 2,520.75 ML Expenditures February 20ML Sidewalk Proj.
STAN COUNTY BIKE2/29/2020 21,562.81 ML Expenditures February 20ML Sidewalk Project, County Wide Sidewalk Priorit., Airport Neighborh Active Transport.Connectivity & Safety,Breat Harte Element. Safe Crossing&Active Transport. Connect., Downtown DEnair Active Transp.Connect. &Safety, Turlock Area ML Sidewalk
STAN COUNTY BIKE3/12/2020 67,535.16 MEASURE L FY19-20 STAN COUNTY ML20-87, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
STAN COUNTY BIKE3/31/2020114.00ML Expenditures March 20ML Sidewalk project
STAN COUNTY BIKE4/28/2020 43,698.25 MEASURE L FY19-20 STAN COUNTY ML20-98, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020
BIKE Total 1,676,992.18 910,745.70 766,246.48
Grand Total 21,800,898.42 18,207,612.93 3,593,285.49