Local Benefits:

  • Provides $6,048,075 for local streets and road repairs and maintenance.
  • Contributes $1,209,615 for traffic congestion management.
  • Provides $604,808 for bike and pedestrian improvements.
  • Includes highway and pedestrian safety improvements from Merced County line northward to Yolo Avenue.

Click here for a list of Revenues and Expenditures


ExpenditureEffective DateRevenueExpenseCash BalanceTransaction DescriptionDocument Description     
NEWMAN STREETS2/6/2018 163,733.81 NEWMAN ML18-09, JUNE17-JAN2018 PAYMENT#1NEWMAN ML18-09, JUNE17-JAN2018 PAYMENT#1
NEWMAN STREETS2/28/2018 56,834.63 Engineering Costs - Start to Feb 2018 - All Projects
NEWMAN STREETS2/28/2018-Engineering Costs for Measure L - Start through February 201
NEWMAN STREETS3/12/2018 22,680.23 MEASURE L NEWMAN ML18-17, FEBRUARY 2018 PMT #2MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
NEWMAN STREETS4/4/2018 7,552.40 Newman - Engineering Costs - March 2018 - All Projects
NEWMAN STREETS4/24/2018 28,323.71 MEASURE L NEWMAN ML18-26, MARCH 2018 PMT #3MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
NEWMAN STREETS5/7/2018 (8,498.95)Newman - Engineering Costs - April 2018 - All ProjectsAdjustment
NEWMAN STREETS5/29/2018 16,354.66 MEASURE L NEWMAN ML18-37, APRIL 2018 PMT #4MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
NEWMAN STREETS6/6/2018 3,014.72 Newman - Engineering Costs - May 2018 - All Projects
NEWMAN STREETS6/25/2018 27,352.42 MEASURE L NEWMAN ML18-47, MAY 2018 PAYMENT #5FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
NEWMAN STREETS6/30/2018 222,540.11 Newman - Constr Mgmt - All Projects - June 2018 Accrual
NEWMAN STREETS6/30/2018 12,824.99 Newman - Constr Mgmt. - All Projects - June 2018
NEWMAN STREETS7/10/2018 3,629.80 Newman - Measure L - June 2018 - Engineering - All Projects
NEWMAN STREETS7/10/2018 23,734.80 Newman - Measure L - June 2018 - Road Repair - All Projects
NEWMAN STREETS7/24/2018 20,173.91 MEASURE L NEWMAN ML19-04, JUNE 2018 PMT #1FY18-19 MEAURE L JUNE 2018, PAYMENT #1
NEWMAN STREETS8/21/2018 21,925.95 MEASURE L NEWMAN ML19-15, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
NEWMAN STREETS8/31/2018 449,579.20 Newman - Road Repair - All Projects - Aug 2018
NEWMAN STREETS8/31/2018 14,294.12 Newman - Engineering Costs - All Projects - Aug 2018
NEWMAN STREETS9/18/2018 19,735.65 MEASURE L NEWMAN ML19-26, AUGUST2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
NEWMAN STREETS9/30/2018 19,428.33 Newman - Constr Mgmt - All Projecs - Sept 2018
NEWMAN STREETS10/24/2018 22,461.32 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L NEWMAN ML19-37, SEPTEMBER 2018 PMT #3
NEWMAN STREETS10/31/2018 457,245.49 Newman - Road Repair - All Projects - Oct 2018
NEWMAN STREETS11/19/2018 29,792.37 MEASURE L NEWMAN ML19-48, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
NEWMAN STREETS11/30/2018 4,163.65 Newman - Constr Mgmt - All Projects - Nov 2018
NEWMAN STREETS11/30/2018 14,330.75 Newman - Road Repair - All Projects - Nov 2018
NEWMAN STREETS12/19/2018 24,168.36 MEASURE L NEWMAN ML19-59, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
NEWMAN STREETS12/31/2018 1,059.20 Newman - Constr Mgmt - All Projects - Dec 2018
NEWMAN STREETS1/24/2019 24,181.05 MEASURE L NEWMAN ML19-70, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
NEWMAN STREETS1/31/2019336.54Newman - Constr Mgmt - All Projects - Jan 2019
NEWMAN STREETS1/31/2019 61,355.34 Newman - Road Repair - All Projects - Jan 2019
NEWMAN STREETS2/27/2019 24,257.96 MEASURE L NEWMAN ML19-81, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
NEWMAN STREETS3/19/2019 25,015.52 MEASURE L NEWMAN ML19-91, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
NEWMAN STREETS3/31/201946.15Newman - Constr Mgmt - All Projects - Mar 2019
NEWMAN STREETS4/17/2019 23,223.61 MEASURE L NEWMAN ML19-101, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
NEWMAN STREETS5/24/2019 23,957.80 MEASURE L NEWMAN ML19-112, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
NEWMAN STREETS6/20/2019 19,257.16 MEASURE L NEWMAN ML19-122, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
NEWMAN STREETS7/23/2019 22,907.84 MEASURE L NEWMAN ML19-132, JUNE 2019 PMT #12FY18/19 MEASURE L PAYMENT; JUNE 2019
NEWMAN STREETS8/28/2019 26,542.34 MEASURE L FY19-20 NEWMAN ML20-04, JULY 2019 PMT #1STANCOG MEASURE L PAYMENT; JUNE 2019
NEWMAN STREETS9/25/2019 23,008.17 MEASURE L FY19-20 NEWMAN ML20-15, AUGUST 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
NEWMAN STREETS11/4/2019 23,565.44 MEASURE L FY19-20 NEWMAN ML20-26, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
NEWMAN STREETS11/21/2019 28,246.87 MEASURE L FY19-20 NEWMAN ML20-37, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
NEWMAN STREETS11/30/2019 1,395.48 Newman - Constr Mgmt - Nov 2019
NEWMAN STREETS12/17/2019 23,389.19 MEASURE L FY19-20 NEWMAN ML20-48, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
NEWMAN STREETS1/29/2020 23,271.56 MEASURE L FY19-20 NEWMAN ML20-59, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
NEWMAN STREETS2/24/2020 23,702.19 MEASURE L FY19-20 NEWMAN ML20-70, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
NEWMAN STREETS3/12/2020 31,539.77 MEASURE L FY19-20 NEWMAN ML20-81, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
NEWMAN STREETS4/28/2020 20,407.64 MEASURE L FY19-20 NEWMAN ML20-92, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020
NEWMAN TRAFFIC2/6/2018 32,746.76 NEWMAN ML18-09, JUNE17-JAN2018 PAYMENT#1NEWMAN ML18-09, JUNE17-JAN2018 PAYMENT#1
NEWMAN TRAFFIC3/12/2018 4,536.05 MEASURE L NEWMAN ML18-17, FEBRUARY 2018 PMT #2MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
NEWMAN TRAFFIC4/24/2018 5,664.74 MEASURE L NEWMAN ML18-26, MARCH 2018 PMT #3MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
NEWMAN TRAFFIC5/7/2018 11,177.90 Newman - Engineering Costs - April 2018 - All Projects
NEWMAN TRAFFIC5/29/2018 3,270.93 MEASURE L NEWMAN ML18-37, APRIL 2018 PMT #4MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
NEWMAN TRAFFIC6/6/2018602.96Newman - Engineering Costs - May 2018 - All Projects
NEWMAN TRAFFIC6/25/2018 5,470.48 MEASURE L NEWMAN ML18-47, MAY 2018 PAYMENT #5FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
NEWMAN TRAFFIC6/30/2018 2,565.06 Newman - Constr Mgmt. - All Projects - June 2018
NEWMAN TRAFFIC6/30/2018 44,509.18 Newman - Road Repair - All Projects - June 2018 Accrual
NEWMAN TRAFFIC7/10/2018725.98Newman - Measure L - June 2018 - Engineering - All Projects
NEWMAN TRAFFIC7/10/2018 4,747.08 Newman - Measure L - June 2018 - Road Repair - All Projects
NEWMAN TRAFFIC7/24/2018 4,034.78 MEASURE L NEWMAN ML19-04, JUNE 2018 PMT #1FY18-19 MEAURE L JUNE 2018, PAYMENT #1
NEWMAN TRAFFIC8/21/2018 4,385.19 MEASURE L NEWMAN ML19-15, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
NEWMAN TRAFFIC8/31/2018 89,918.18 Newman - Road Repair - All Projects - Aug 2018
NEWMAN TRAFFIC8/31/2018 2,858.90 Newman - Engineering Costs - All Projects - Aug 2018
NEWMAN TRAFFIC9/18/2018 3,947.13 MEASURE L NEWMAN ML19-26, AUGUST2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
NEWMAN TRAFFIC9/30/2018 3,885.77 Newman - Construction Mgmt. - All Projects - Sept 2018
NEWMAN TRAFFIC10/24/2018 4,492.26 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L NEWMAN ML19-37, SEPTEMBER 2018 PMT #3
NEWMAN TRAFFIC10/31/2018 91,451.48 Newman - Road Repair - All Projects - Oct 2018
NEWMAN TRAFFIC11/19/2018 5,958.47 MEASURE L NEWMAN ML19-48, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
NEWMAN TRAFFIC11/30/2018 2,866.23 Newman - Road Repair - All Projects - Nov 2018
NEWMAN TRAFFIC11/30/2018832.75Newman - Constr Mgmt - All Projects - Nov 2018
NEWMAN TRAFFIC12/19/2018 4,833.67 MEASURE L NEWMAN ML19-59, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
NEWMAN TRAFFIC12/31/2018211.85Newman - Constr Mgmt - All Projects - Dec 2018
NEWMAN TRAFFIC1/24/2019 4,836.21 MEASURE L NEWMAN ML19-70, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
NEWMAN TRAFFIC1/31/201967.31Newman - Constr Mgmt - All Projects - Jan 2019
NEWMAN TRAFFIC1/31/2019 12,271.39 Newman - Road Repair - All Projects - Jan 2019
NEWMAN TRAFFIC2/27/2019 4,851.59 MEASURE L NEWMAN ML19-81, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
NEWMAN TRAFFIC3/19/2019 5,003.10 MEASURE L NEWMAN ML19-91, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
NEWMAN TRAFFIC3/31/20199.23Newman - Constr Mgmt - All Projects - Mar 2019
NEWMAN TRAFFIC4/17/2019 4,644.72 MEASURE L NEWMAN ML19-101, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
NEWMAN TRAFFIC5/24/2019 4,791.56 MEASURE L NEWMAN ML19-112, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
NEWMAN TRAFFIC6/20/2019 3,851.43 MEASURE L NEWMAN ML19-122, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
NEWMAN TRAFFIC7/23/2019 4,581.57 MEASURE L NEWMAN ML19-132, JUNE 2019 PMT #12FY18/19 MEASURE L PAYMENT; JUNE 2019
NEWMAN TRAFFIC8/28/2019 5,308.47 MEASURE L FY19-20 NEWMAN ML20-04, JULY 2019 PMT #1STANCOG MEASURE L PAYMENT; JUNE 2019
NEWMAN TRAFFIC9/25/2019 4,601.63 MEASURE L FY19-20 NEWMAN ML20-15, AUGUST 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
NEWMAN TRAFFIC11/4/2019 4,713.09 MEASURE L FY19-20 NEWMAN ML20-26, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
NEWMAN TRAFFIC11/21/2019 5,649.37 MEASURE L FY19-20 NEWMAN ML20-37, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
NEWMAN TRAFFIC11/30/2019279.10Newman - Constr Mgmt - Nov 2019
NEWMAN TRAFFIC12/17/2019 4,677.84 MEASURE L FY19-20 NEWMAN ML20-48, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
NEWMAN TRAFFIC1/29/2020 4,654.31 MEASURE L FY19-20 NEWMAN ML20-59, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
NEWMAN TRAFFIC2/24/2020 4,740.44 MEASURE L FY19-20 NEWMAN ML20-70, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
NEWMAN TRAFFIC3/12/2020 6,307.95 MEASURE L FY19-20 NEWMAN ML20-81, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
NEWMAN TRAFFIC4/28/2020 4,081.53 MEASURE L FY19-20 NEWMAN ML20-92, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020
NEWMAN BIKE2/6/2018 16,373.38 NEWMAN ML18-09, JUNE17-JAN2018 PAYMENT#1NEWMAN ML18-09, JUNE17-JAN2018 PAYMENT#1
NEWMAN BIKE3/12/2018 2,268.02 MEASURE L NEWMAN ML18-17, FEBRUARY 2018 PMT #2MEASURE L FEBRUARY 2018 PAYMENT ALL JURISDICTIONS
NEWMAN BIKE4/24/2018 2,832.37 MEASURE L NEWMAN ML18-26, MARCH 2018 PMT #3MEASURE L MARCH 2018 PAYMENT ALL JURISDICTIONS
NEWMAN BIKE5/7/2018 5,588.59 Newman - Engineering Costs - April 2018 - All Projects
NEWMAN BIKE5/29/2018 1,635.47 MEASURE L NEWMAN ML18-37, APRIL 2018 PMT #4MEASURE L APRIL 2018 PAYMENT ALL JURISDICTIONS
NEWMAN BIKE6/6/2018301.46Newman - Engineering Costs - May 2018 - All Projects
NEWMAN BIKE6/25/2018 2,735.24 MEASURE L NEWMAN ML18-47, MAY 2018 PAYMENT #5FY17-18 MEASURE L MAY 2018 PAYMENT ALL JURISDICTIONS
NEWMAN BIKE6/30/2018 22,253.15 Newman - Road Repair - All Projects - June 2018 Accrual
NEWMAN BIKE6/30/2018 1,282.45 Newman - Constr Mgmt. - All Projects - June 2018
NEWMAN BIKE7/10/2018362.97Newman - Measure L - June 2018 - Engineering - All Projects
NEWMAN BIKE7/10/2018 2,373.39 Newman - Measure L - June 2018 - Road Repair - All Projects
NEWMAN BIKE7/24/2018 2,017.39 MEASURE L NEWMAN ML19-04, JUNE 2018 PMT #1FY18-19 MEAURE L JUNE 2018, PAYMENT #1
NEWMAN BIKE8/21/2018 2,192.59 MEASURE L NEWMAN ML19-15, JULY 2018 PMT #1FY18-19 MEAURE L JULY 2018, PAYMENT #1
NEWMAN BIKE8/31/2018 44,956.17 Newman - Road Repair - All Projects - Aug 2018
NEWMAN BIKE8/31/2018 1,429.36 Newman - Engineering Costs - All Projects - Aug 2018
NEWMAN BIKE9/18/2018 1,973.56 MEASURE L NEWMAN ML19-26, AUGUST2018 PMT #2FY18-19 MEAURE L AUGUST 2018, PAYMENT #2
NEWMAN BIKE9/30/2018 1,942.75 Newman - Construction Mgmt. - All Projects - Sept 2018
NEWMAN BIKE10/24/2018 2,246.13 MEASURE L SEPTEMBER 2018 PAYMENTMEASURE L NEWMAN ML19-37, SEPTEMBER 2018 PMT #3
NEWMAN BIKE10/31/2018 45,722.76 Newman - Road Repair - All Projects - Oct 2018
NEWMAN BIKE11/19/2018 2,979.24 MEASURE L NEWMAN ML19-48, OCTOBER 2018 PMT #4MEASURE L OCTOBER 2018 PAYMENT
NEWMAN BIKE11/30/2018 1,433.66 Newman - Road Repair - All Projects - Nov 2018
NEWMAN BIKE11/30/2018416.35Newman - Constr Mgmt - All Projects - Nov 2018
NEWMAN BIKE12/19/2018 2,416.84 MEASURE L NEWMAN ML19-59, NOVEMBER 2018 PMT #5MEASURE L NOVEMBER 2018 PAYMENT
NEWMAN BIKE12/31/2018105.91Newman - Constr Mgmt - All Projects - Dec 2018
NEWMAN BIKE1/24/2019 2,418.10 MEASURE L NEWMAN ML19-70, DECEMBER 2018 PMT #6MEASURE L DECEMBER 2018 PAYMENT
NEWMAN BIKE1/31/201933.65Newman - Constr Mgmt - All Projects - Jan 2019
NEWMAN BIKE1/31/2019 6,135.29 Newman - Road Repair - All Projects - Jan 2019
NEWMAN BIKE2/27/2019 2,425.80 MEASURE L NEWMAN ML19-81, JANUARY 2019 PMT #7MEASURE L JANUARY 2019 PAYMENT
NEWMAN BIKE3/19/2019 2,501.55 MEASURE L NEWMAN ML19-91, FEBRUARY 2019 PMT #8MEASURE L FEBRUARY 2019 PAYMENT
NEWMAN BIKE3/31/20194.62Newman - Constr Mgmt - All Projects - Mar 2019
NEWMAN BIKE4/17/2019 2,322.36 MEASURE L NEWMAN ML19-101, MARCH 2019 PMT #9MEASURE L MARCH 2019 PAYMENT
NEWMAN BIKE5/24/2019 2,395.78 MEASURE L NEWMAN ML19-112, APRIL 2019 PMT #10MEASURE L APRIL 2019 PAYMENT
NEWMAN BIKE6/20/2019 1,925.72 MEASURE L NEWMAN ML19-122, MAY 2019 PMT #11MEASURE L MAY 2019 PAYMENT
NEWMAN BIKE7/23/2019 2,290.78 MEASURE L NEWMAN ML19-132, JUNE 2019 PMT #12FY18/19 MEASURE L PAYMENT; JUNE 2019
NEWMAN BIKE8/28/2019 2,654.23 MEASURE L FY19-20 NEWMAN ML20-04, JULY 2019 PMT #1STANCOG MEASURE L PAYMENT; JUNE 2019
NEWMAN BIKE9/25/2019 2,300.82 MEASURE L FY19-20 NEWMAN ML20-15, AUGUST 2019 PMT #2STANCOG MEASURE L PAYMENT; AUGUST 2019
NEWMAN BIKE11/4/2019 2,356.54 MEASURE L FY19-20 NEWMAN ML20-26, SEPTEMBER 2019 PMT #3STANCOG MEASURE L PAYMENT; SEPTEMBER 2019
NEWMAN BIKE11/21/2019 2,824.69 MEASURE L FY19-20 NEWMAN ML20-37, OCTOBER 2019 PMT #4STANCOG MEASURE L PAYMENT; OCTOBER 2019
NEWMAN BIKE11/30/2019139.55Newman - Constr Mgmt - Nov 2019
NEWMAN BIKE12/17/2019 2,338.92 MEASURE L FY19-20 NEWMAN ML20-48, NOVEMBER 2019 PMT #5STANCOG MEASURE L PAYMENT; NOVEMBER 2019
NEWMAN BIKE1/29/2020 2,327.16 MEASURE L FY19-20 NEWMAN ML20-59, DECEMBER 2019 PMT #6STANCOG MEASURE L PAYMENT; DECEMBER 2019
NEWMAN BIKE2/24/2020 2,370.22 MEASURE L FY19-20 NEWMAN ML20-70, JANUARY 2020 PMT #7STANCOG MEASURE L PAYMENT; JANUARY 2020
NEWMAN BIKE3/12/2020 3,153.98 MEASURE L FY19-20 NEWMAN ML20-81, FEBRUARY 2020 PMT #8STANCOG MEASURE L PAYMENT; FEBRUARY 2020
NEWMAN BIKE4/28/2020 2,040.76 MEASURE L FY19-20 NEWMAN ML20-92, MARCH 2020 PMT #9STANCOG MEASURE L PAYMENT; MARCH 2020

Allocations by expenditure categories: